Similar Projects
The Sage School
New Construction
Design
Hailey, ID 83333

HVAC System Replacement
Renovation, Alteration
Results
Potlatch, ID

Meridian Middle School Cafeteria Remodel
Renovation - 7,500 SF
Results
Meridian, ID 83642

Renovate Restroom / Main Building Classroom, Idaho School
Renovation
Bidding
$510,000 est. value
Gooding, ID 83330

Owyhee High School Greenhouse
New Construction
Post-Bid
$250,000 est. value
Meridian, ID 83646

Kendrick High School Concessions and Locker Room
Renovation, Addition, Alteration
Post-Bid
Kendrick, ID

IFSD Admin Basement Renovation Subcontractor Packages 1.0 - 15.0
Renovation
Post-Bid
$500,000 est. value
Idaho Falls, ID 83401

Construction Manager - Additions and Remodeling to NFHS, AES, HFE, SFHS, and CTE and SFJHS Buildings
Renovation, Addition
Post-Bid
$100,000 est. value
Saint Anthony, ID

Reported 05/27/2022 12:00 AM
Project Title

Rexburg FM Office Restroom

Physical Address View project details and contacts
City, State (County) Rexburg, ID 83440   (Madison County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Toilet Room addition. F. Furnish and install complete system of piping, valved as indicated or as necessary to completely control entire apparatus: 1. Pipe drawings are diagrammatic and indicate general location and connections. Piping may have to be offset, lowered, or raised as required or directed at site. This does not relieve this Division from responsibility for proper installation of plumbing systems. 2. Arrange piping to not interfere with removal of other equipment, ducts, or devices, or block access to doors, windows, or access openings: a. Arrange so as to facilitate removal of tube bundles. b. Provide accessible flanges or ground joint unions, as applicable for type of piping specified, at connections to equipment and on bypasses. 1) Make connections of dissimilar metals with di-electric unions. 2) Install valves and unions ahead of traps and strainers. Provide unions on both sides of traps. c. Do not use reducing bushings, bull head tees, close nipples, or running couplings. Street elbows are allowed only on potable water pipe 3/4 inch (19 mm) in diameter and smaller. d. Install piping systems so they may be easily drained e. Install piping to insure noiseless circulation. f. Place valves and specialties to permit easy operation and access. Valves shall be regulated, packed, and glands adjusted at completion of work before final acceptance. 3. Do not install piping in shear walls. 4. Cut piping accurately to measurements established at site. Remove burr and cutting slag from pipes. 5. Work piping into place without springing or forcing. Make piping connections to pumps and other equipment without strain at piping connection. Remove bolts in flanged connections or disconnect piping to demonstrate that piping has been so connected, if requested. 6. Make changes in direction with proper fittings. 7. Expansion of Thermoplastic Pipe: a. Provide for expansion in every 30 feet (9 meters) of straight run. b. Provide 12 inch (300 mm) offset below roof line in each vent line penetrating roof. 8. Expansion of PEX Pipe: Allow for expansion and contraction of PEX pipe as recommended by Pipe Manufacturer.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.
Division 27 - Communications.
Division 32 - Exterior Improvements.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts