Similar Projects
North York Widening 1 (Exit 19)
Infrastructure
Conception
$104,100,000 est. value
York, PA 17408

Detters Mill Road Bridge
New Construction, Renovation, Demolition, Infrastructure
Conception
Less than $1,263,478 est. value
PA

North York Widening 2 (Codorus Creek Bridge)
Infrastructure
Design
York, PA 17408

George St over Tylers Run
New Construction, Infrastructure
Design
$1,825,697 est. value
PA

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

2022 Main Street CDBG
Infrastructure
Bidding
$375,000 est. value
Delta, PA 17314

SuperPave Materials - Street Construction
Post-Bid
Shrewsbury, PA

2021 Street Construction
Post-Bid
Dover, PA

Stone, Seal Coat, Superpave
Results
Delta, PA 17314

2020 Kister Street Project
Results
Goldsboro, PA 17319

E Prospect Road Improvements
Alteration
Conception
$3,348,769 est. value
York, PA

Wago Road Bridge
Renovation, Alteration
Design
$3,526,487 est. value
Mount Wolf, PA 17347

2021 Super Pave Materials
Post-Bid
Dover, PA

Superpave and Bituminous Seal Coat
Results
York, PA 17404

Harmony Grove Rd Br PM
Renovation, Alteration
Conception
$3,375,680 est. value
Dover, PA 17315

Last Updated 07/13/2022 10:00 AM
Project Title

74/24 Curb, Sidewalk, Storm Sewer, and Street Improvements

Physical Address View project details and contacts
City, State (County) Red Lion, PA   (York County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of existing concrete curb and brick sidewalk; installation of new concrete curb and ADA curb ramps; sign relocation; storm sewer system improvements; and milling and paving.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents