Similar Projects
Installation of a Metal Roof on at the Water Treatment Plant Building
Renovation
Design
Blytheville, AR 72315

Pine Bluff Arsenal Building 10-030 Roof Repair by Replacement
Renovation
Sub-Bidding
$250,000 CJ est. value
White Hall, AR 71602

PBA 10-040 Roof Repair/Replacement
Renovation - 5,479 SF
Sub-Bidding
$250,000 CJ est. value
White Hall, AR 71602

Roofing Project at Crater of Diamonds State Park
Alteration
Post-Bid
$300,000 est. value
Murfreesboro, AR 71958

A New Roof and a New Gym Floor
Alteration
Post-Bid
$40,000 est. value
Morrilton, AR

Joe Martin Health Sciences Roof Replacement
Alteration
Results
Pocahontas, AR 72455

Roof Bid
Alteration
Results
Berryville, AR 72616

Roofing Bids: 4-5 Buildings
Renovation
Construction
$57,835 CJ est. value
Beebe, AR 72012

Upgrade Roof Systems | Fayetteville, AR
Renovation
Sub-Bidding
$250,000 CJ est. value
Fayetteville, AR 72703

New Roof on the Field House Facility
Alteration
Post-Bid
$40,000 est. value
Hot Springs, AR

Sealing of Metal Roof
Alteration
Results
$200,000 est. value
Hope, AR 71801

Conway Fire Department Station 4 Roof
Renovation
Sub-Bidding
$138,000 CJ est. value
Conway, AR 72034

East Side Re-Roof, Statehouse Convention Center
Alteration
Post-Bid
$300,000 est. value
Little Rock, AR 72201

Installation of Metal Roof
Alteration
Results
$200,000 est. value
Hope, AR 71801

Construction - Town Center Roof Restoration
Renovation
Sub-Bidding
$320,000 CJ est. value
Fayetteville, AR 72701

Last Updated 10/09/2023 12:32 AM
Project Title

Construction - RTC Transfer Station & Water Sewer Roof Rehab

Physical Address View project details and contacts
City, State (County) Fayetteville, AR 72701   (Washington County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

City of Fayetteville reserves the right to with hold the awarding of a contract a reasonable period of time from the date of opening bids, not to exceed sixty (60) days except with the consent of the Successful Scope of alterations work is indicated on drawings. A Removal and replacement of all exposed fasteners. B. removal and cleaning of all existing liquid applied fasteners C. No demolition to be performed without the approval of the Architect or Owner In the event a bidder opts to submit a cashier's check for a bid bond, the actual physical cashier's check shall be delivered to the City prior to the deadline. A one hundred percent (100%) performance bond and separate payment bond is required with the contract awarded Question Cuttoff Date & Time 10/17/2023 05:00:00 PM (ET)

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents