Similar Projects
Concrete and Asphalt Repair Program
Bidding
Amherst, MA

Crack Sealing
Post-Bid
Amherst, MA 01002

Dog Park and Paved Parking Area
Post-Bid
Amherst, MA

Chesterfield Road, Main Street and Cross Street Leeds Paving
Results
Less than $2,100,000 est. value
Northampton, MA

Resurfacing and Related Working (Including 9 Bridges) along a Section of Route 24 (Fall River Expressway)
Results
Less than $1,357,000 est. value
Goshen, MA 01032

Hot Mix Asphalt (HMA), Complete and in Place, and Associated Work on Various Streets
Post-Bid
Amherst, MA

Roadway Reconstruction and Related Work on a Section of Route 143 (Old North and Williamsburg Roads) (Phase 1)
Results
Less than $7,458,678 est. value
Cummington, Worthington, MA 01026

Statewide Airport Pavement Maintenance Project
Post-Bid
Less than $1,500,000 est. value

Intersection Improvements and Related Work (including Signals) at Main, West (Routes 9 and 32) and Adjacent Streets
Results
Less than $2,252,154 est. value
Ware, MA 01082

Statewide Pavement Maintenance and Pavement Markings at Various Public-Use Airports
Post-Bid
Less than $1,500,000 est. value
Wakefield, MA

Resurfacing and Related Work Along Sections of Route 32 (Palmer and Ware Roads)
Results
Less than $2,407,000 est. value
Palmer, Ware, MA 01009

Liquid Sludge Hauling and Disposal
Term Contract
Post-Bid
Hadley, MA

Intersection and Roadway Improvements at Ferry Street with Pleasant Street and Lovefield Street
Results
Less than $2,800,000 est. value
Easthampton, MA 01027

Resurfacing and Related Work along a Section of Interstate 90 Westbound
Results
Less than $8,466,187 est. value

Resurfacing and Related Work along a Section of Route 202 (Granby Road and West State Street)
Results
Less than $4,319,239 est. value
Granby, South Hadley, MA 01033

Last Updated 06/10/2020 10:49 AM
Project Title

Roadway Reconstruction and Related Work (including Signals) along a Section Of Route 202/21 (State and Maple Streets)

Physical Address View project details and contacts
City, State (County) Belchertown, MA 01007   (Hampshire County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $4,831,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

"1.000","Ls","Schedule Of Operations - Fixed Price $37500","100." "0.500","a","Clearing And Grubbing","101." "26.000","Ea","Individual Tree Protection","102.51" "3.000","Ea","Tree Removed - Diameter Under 24 Inches","103." "5.000","Ea","Tree Removed - Diameter 24 Inches And Over","104." "2.000","Ea","Stump Removed","105." "7800.000","Cy","Earth Excavation","120." "130.000","Cy","Class a Rock Excavation","121." "36.000","Cy","Bridge Excavation","140." "650.000","Cy","Class a Trench Excavation","141." "60.000","Cy","Test Pit For Exploration","141.1" "620.000","Cy","Class b Trench Excavation","142." "100.000","Cy","Class b Rock Excavation","144." "16.000","Ea","Drainage Structure Removed","146." "4600.000","Cy","Gravel Borrow","151." "3.000","Cy","Gravel Borrow For Bridge Foundation","151.1" "45.000","Cy","Gravel Borrow For Backfilling Structures And Pipes","151.2" "300.000","Cy","Controlled Density Fill - Excavatable","153." "740.000","Ton","Crushed Stone","156." "15230.000","Sy","Fine Grading And Compacting - Subgrade Area","170." "1.000","Ls","Inspection And Testing For Asbestos","182.1" "50.000","Ft","Removal Of Asbestos","182.2" "45.000","Ea","Catch Basin","201." "1.000","Ea","Special Catch Basin","201.3" "8.000","Ea","Manhole","202." "1.000","Ea","Manhole - 5 Foot Diameter","202.5" "12.000","Ea","Gutter Inlet","204." "109.000","Ea","Drainage Structure Adjusted","220." "10.000","Ft","Drainage Structure Rebuilt","220.2" "17.000","Ea","Drainage Structure Change In Type","220.3" "4.000","Ea","Drainage Structure Remodeled","220.5" "11.000","Ea","Sanitary Structure Adjusted","220.7" "1.000","Ea","Sanitary Structure Remodeled","220.8" "38.000","Ea","Frame And Cover","221." "6.000","Ea","Frame And Grate - Massdot Cascade Type","222.1" "48.000","Ea","Frame And Grate (Or Cover) Municipal Standard","222.3" "1.000","Ea","Frame And Grate – Double","222.31" "33.000","Ea","Frame And Grate (Or Cover) Removed And Discarded","223.2" "44.000","Ea","12 Inch Hood","224.12" "50.000","Cy","Removal Of Drainage Structure Sediment","227.3" "5000.000","Ft","Removal Of Drainage Pipe Sediment","227.31" "20.000","Sf","Masonry Plug","227.4" "580.000","Ft","10 Inch Ductile Iron Pipe","238.10" "260.000","Ft","12 Inch Ductile Iron Pipe","238.12" "1190.000","Ft","12 Inch Reinforced Concrete Pipe","241.12" "860.000","Ft","15 Inch Reinforced Concrete Pipe","241.15" "190.000","Ft","18 Inch Reinforced Concrete Pipe","241.18" "3.000","Ea","15 Inch Reinforced Concrete Pipe Flared End","242.15" "30.000","Sy","Stone For Pipe Ends","258." "1460.000","Ft","8 Inch Ductile Iron Water Pipe (Rubber Gasket)","302.08" "220.000","Ft","12 Inch Ductile Iron Water Pipe (Rubber Gasket)","302.12" "130.000","Ft","6 Inch Ductile Iron Water Pipe (Mechanical Joint)","303.06" "3870.000","Lb","Ductile Iron Fittings For Water Pipe","309." "720.000","Ft","3/4 Inch Polyethylene Service Connections","348.075" "130.000","Ft","1 Inch Polyethylene Service Connections","348.1" "6.000","Ea","6 Inch Gate And Gate Box","350.06" "8.000","Ea","8 Inch Gate And Gate Box","350.08" "4.000","Ea","12 Inch Gate And Gate Box","350.12" "10.000","Ea","Gate Box Adjusted","358." "24.000","Ea","3/4 Inch Corporation Cock","363.075" "4.000","Ea","1 Inch Corporation Cock","363.1" "4.000","Ea","Hydrant","376." "3.000","Ea","Hydrant - Removed And Stacked","376.3" "2.000","Ea","Hydrant - Adjusted","376.5" "28.000","Ea","Service Box (Municipal Standard)","381.01" "2.000","Ea","Service Box Adjusted","381.3" "28.000","Ea","Curb Stop","384." "680.000","Cy","Dense Graded Crushed Stone For Sub-Base","402." "19220.000","Sy","Pavement Micro Milling","415.3" "1120.000","Sy","Cement Concrete Base Course","430." "3400.000","Lb","Calcium Chloride For Roadway Dust Control","440." "15.000","Mgl","Water For Roadway Dust Control","443." "2650.000","Ton","Superpave Surface Course - 12.5 (Ssc - 12.5)","450.23" "4540.000","Ton","Superpave Intermediate Course - 19.0 (Sic - 19.0)","450.32" "1010.000","Ton","Hma For Patching","451." "4090.000","Gal","Asphalt Emulsion For Tack Coat","452." "27550.000","Ft","Hma Joint Sealant","453." "250.000","Ton","Hot Mix Asphalt For Miscellaneous Work","472." "5.000","Ft","Sawcutting Portland Cement Concrete","482.4" "11240.000","Ft","Sawcutting Asphalt Pavement For Box Widening","482.5" "200.000","Ft","Granite Curb Type Va5 - Straight","505." "40.000","Ft","Granite Curb Type Va5 - Curved","505.1" "4710.000","Ft","Granite Curb Type Vb - Straight","506." "650.000","Ft","Granite Curb Type Vb - Curved","506.1" "740.000","Ft","Granite Transition Curb For Wheelchair Ramps - Straight","509." "460.000","Ft","Granite Transition Curb For Wheelchair Ramps - Curved","509.1" "2.000","Ea","Granite Curb Inlet - Straight","514." "5020.000","Ft","Curb Removed And Reset","580." "1680.000","Ft","Curb Removed And Discarded","594." "2120.000","Ft","Guardrail, Tl-2 (Single Faced)","620.12" "40.000","Ft","Guardrail - Curved, Tl-2 (Single Faced)","620.32" "3.000","Ea","Guardrail Tangent End Treatment, Tl-2","627.82" "1.000","Ea","Guardrail Flare End Treatment, Tl-2","627.92" "4.000","Ea","Transition To Bridge Rail","628.24" "2120.000","Ft","Highway Guard Removed And Discarded","630.2" "30.000","Ft","Wood Fence","655.3" "15.000","Ft","Metal Handrail","655.31" "210.000","Ft","Temporary Fence","657." "30.000","Cy","Stone Masonry Wall In Cement Mortar","685." "85.000","Ea","Silt Sack","697.1" "1470.000","Sy","Geotextile Fabric For Separation","698.3" "70.000","Sy","Cement Concrete Sidewalk","701." "430.000","Sy","Cement Concrete Wheelchair Ramp","701.2" "730.000","Ton","Hot Mix Asphalt Walk Surface","702." "450.000","Ton","Hot Mix Asphalt Driveway","703." "10.000","Sy","Flagstone Walk","705." "10.000","Sy","Flagstone Walk Removed And Reset","705.1" "5.000","Sy","Brick Walk","706." "5.000","Sy","Brick Walk Removed And Relaid","706.1" "19.000","Ea","Rural Mail Box Removed And Reset","715." "21.000","Mo","Engineers Field Office And Equipment (Type a)","740." "1.000","Ls","Mobilization","748." "1390.000","Cy","Loam Borrow","751." "1.000","Ls","Npdes Stormwater Pollution Prevention Plan","756." "9950.000","Sy","Seeding","765." "2770.000","Sy","Seeding - Restoration Mix","765.4" "3080.000","Ft","Sediment Control Barrier","767.121" "1170.000","Sy","Jute Mesh Erosion Control Fabric","767.731" "1600.000","Sy","Composted Mulch Over Modified Rockfill","767.78" "2406.000","Ft","Pavement Milling Mulch Under Guard Rail","769." "20.000","Ea","Maple - Sugar 2-2.5 Inches Caliper","776.836" "1480.000","Ft","3 Inch Electrical Conduit Type Nm - Plastic -(Ul)","804.3" "35.000","Ea","Pull Box 12 x 12 Inches - Sd2.031","811.31" "1.000","Ea","Light Standard Foundation Precast","812.09" "1.000","Ls","Underground Service Relocation No. 1","813.811" "1.000","Ls","Underground Service Relocation No. 2","813.812" "1.000","Ls","Underground Service Relocation No. 3","813.813" "1.000","Ls","Underground Service Relocation No. 4","813.814" "1.000","Ls","Underground Service Relocation No. 5","813.815" "1.000","Ls","Traffic Control Signal Location No. 1","815.1" "1.000","Ls","Traffic Control Signal Location No. 2","815.2" "1.000","Ls","Traffic Control Signal Removed And Stacked","816.80" "1.000","Ea","Highway Lighting Pole And Luminaire Removed And Reset","823.70" "1.000","Ls","Rectangular Rapid Flashing Beacon","824.211" "1.000","Ls","Ground Mount School Zone Speed Limit Beacon Location No. 1","824.351" "1.000","Ls","Ground Mount School Zone Speed Limit Beacon Location No. 2","824.352" "350.000","Sf","Roadside Guide Sign(Ma-d1-Xx) - Aluminum Panel (Type b)","829.01" "6.000","Ea","Roadside Guide Sign And Support Removed And Discarded","829.06" "470.000","Sf","Warning-Regulatory And Route Marker - Aluminum Panel (Type a)","832." "12.000","Ea","Support For Guide Sign (Ma-d1-Xx) Steel","841.9" "61.000","Ea","Sign Sup (n/Guide)+Rte Mkr w/1 Brkway Post Assembly - Steel","847.1" "160.000","Hr","Roadway Flagger","850.41" "30.000","Day","Traffic Cones For Traffic Management","851.1" "2300.000","Sf","Safety Signing For Traffic Management","852." "300.000","Ft","Temporary Pedestrian Barricade","852.11" "4.000","Ea","Temporary Pedestrian Curb Ramp","852.12" "19.000","Ea","Portable Breakaway Barricade Type Iii","853.1" "1200.000","Ft","Temporary Restrained Barrier","853.3" "1200.000","Ft","Temporary Restrained Barrier Removed And Reset","853.31" "130.000","Day","Temporary Illumination For Work Zone","853.8" "40000.000","Ft","Temporary Paving Markings - 6 Inch (Painted)","854.016" "13500.000","Ft","Temporary Paving Markings - 6 Inch (Tape)","854.036" "230.000","Sf","Pavement Marking Removal","854.1" "84.000","Day","Portable Changeable Message Sign","856.12" "66000.000","Day","Reflectorized Drum","859." "260.000","Day","Reflectorized Drums With Sequential Flashing Warning Lights","859.1" "41.000","Ea","Pavement Legends Reflectorized Preformed Thermoplastic - Bike Lane Rider","864.031" "41.000","Ea","Pavement Legends Reflectorized Preformed Thermoplastic - Bike Lane Arrow","864.032" "11.000","Ea","Pavement Legends Reflectorized Preformed Thermoplastic - Bike Rider At Stop Line","864.034" "1050.000","Sf","Pavement Arrows And Legends Refl. White (Thermoplastic)","864.04" "18690.000","Ft","6 Inch Reflectorized White Line (Polyurea) (Recessed)","866.206" "2000.000","Ft","12 Inch Reflectorized White Line (Polyurea) (Recessed)","866.212" "14880.000","Ft","6 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.206" "440.000","Ft","12 Inch Reflectorized Yellow Line (Polyurea) (Recessed)","867.212" "15.000","Ea","Street Name Sign","874." "1.000","Ea","Traffic Sign Removed And Reset","874.2" "55.000","Ea","Traffic Sign Removed And Discarded","874.41" "5.000","Cy","3000 Psi, 1.5 Inch, 470 Cement Concrete","903." "5.000","Cy","4000 Psi, 3/4 Inch, 610 Cement Concrete","904." "17.000","Cy","5000 Psi, 3/4 Inch, 685 Hp Cement Concrete","904.3" "500.000","Sy","Concrete Penetrant","908.11" "110.000","Lb","Steel Reinforcement For Structures","910." "2970.000","Lb","Steel Reinforcement For Structures - Epoxy Coated","910.1" "1390.000","Ton","Modified Rockfill","986."

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents