Similar Projects
Roofing Removal and Replacement
Alteration
Design
$300,000 est. value
Flint, MI 48505

Soffit Replacement
Renovation
Sub-Bidding
$40,000 CJ est. value
Montrose, MI 48457

High School Performing Arts Center Roofing
Alteration
Post-Bid
Davison, MI

Kearsley Community Schools Roofing
Alteration
Post-Bid
Flint, MI 48506

2021 DPW Garage Roof Replacement
Results
Montrose, MI 48457

Roof Repairs (South Building)
Alteration
Results
$900,000 est. value
Flint, MI 48502

Terminal Roof Replacement
Alteration
Post-Bid
Flint, MI

Fleet Maintenance Building Roof Repair
Alteration
Post-Bid
$600,000 est. value
Flint, MI 48503

New Genesee County Building Re-Roofing Project
Renovation
Post-Bid
$600,000 CJ est. value
Flint, MI 48502

Montrose High School Auditorium Roof Restoration
Renovation
Post-Bid
$300,000 CJ est. value
Montrose, MI 48457

2022 Sinking Fund High School and Fund Middle School Re-Roof
Alteration
Post-Bid
$700,000 est. value
Flushing, MI

For-Mar Shingled Roof Replacements
Renovation
Post-Bid
$400,000 CJ est. value
Flint, MI 48502

Flat Roof and Skylight Replacement
Renovation
Post-Bid
$400,000 CJ est. value
Flint, MI 48506

BP#05 Central Roof Replacement
Renovation
Post-Bid
$30,000 CJ est. value
Mount Morris, MI 48458

For-Mar Shingled Roof Replacements
Renovation
Post-Bid
Flint, MI 48502

Last Updated 02/02/2023 05:03 PM
Project Title

Terminal Roof Replacement - Bishop International Airport

Physical Address View project details and contacts
City, State (County) Flint, MI 48507   (Genesee County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids
Project Status Results, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $4,210,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The proposed Work includes the following: Removal of existing roof membrane and all accessories including insulations and installation of new single ply roof membrane system including all accessories (flashing, counterflashing, blocking, coping, etc.) Work included selective removal of a section(s) of standing seam metal roofing at gutter areas, roof board, and rigid insulation down to deck, EFIS wall covering, and related trims and flashings as required for new roof system. Installation of a new EPDM Single-Ply Membrane over a new metal gutter and roof insulation at select gutter areas and installation of new Single-Ply mechanically adhered PVC membrane all other areas. Removal and reinstallation of snow guard system as indicated on drawings. Each Bidder is individually responsible for the careful examination of the site of the proposed Work, the Proposal, Plans, General Provisions, Technical Specifications, Contract Forms, and all requirements of the project. The failure or omission by any Bidder to do so shall in no way relieve any Bidder from any obligation with respect to its bid. The Authority reserves the following rights: to accept or reject any or all bids; and to award the Contract to the most responsive and responsible Bidder whose bid is determined by the Authority to be in its best interest. Any and all proposals as submitted herein are subject to further negotiation at the option of Authority. No contract or agreement of any kind arising out of this proposal and/or negotiations shall be binding or valid against the Authority, its department, officers, employees, or agents unless such contract or agreement is in writing, has been authorized by the Bishop International Airport Authority Board of Directors, and signed by the Airport Director or his designee.

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents