Similar Projects
Electrical and Waterline Installation
Term Contract
Design
$250,000 to $500,000 est. value
Saint Charles, MO 65355

Salisbury Road Water Main Replacement
Infrastructure
Bidding
Independence, MO

St. Paul Elevated Tank Rehabilitation and Painting
Infrastructure, Alteration
Bidding
Saint Paul, MO

Valve Testing and Repairs
Term Contract
Post-Bid
Columbia, MO

Butterfly Valves and Flanges
Post-Bid
Saint Louis, MO

Water Storage Tank Maintenance and Lindenwood New Tank Interior Renovation
Results
Saint Charles, MO

Supplemental Workforce for Water Distribution System Repairs
Results
Kansas City, MO

Pump and Related Equipment Repair, Maintenance and Parts - MDC
Term Contract
Bidding

Electrical Submersible Dewatering Pumps
Post-Bid
Saint Louis, MO

Missouri Bluffs Park Well
Alteration
Results
Lake Saint Louis, MO 63367

Interior Painting Services
Alteration
Bidding
Liberty, MO 64068

Traffic and Airfield Marking Paint
Alteration
Post-Bid
Springfield, MO

Combination Project for Hargis Lake Sanitary Sewer, Stormwater Sewer and Water Line Relocation
Infrastructure
Results
Belton, MO 64012

Emergency Drought Improvements - Specialty Materials and Equipment
Infrastructure, Alteration
Bidding
Milan, MO

PVC Conduit
Infrastructure
Post-Bid
Sullivan, MO

Reported 02/12/2022 12:00 AM
Project Title

Construction of Water System Improvements

Physical Address View project details and contacts
City, State (County) Clarkton, MO   (Dunklin County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Painting, Pumps and Wells, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of two contracts: Contract 1 – 59,665 lf of waterline replacements, well pump replacements, well house construction, disinfection equipment, and well control replacement. Contract 2 – 125,000 gallon elevated storage tank painting and repairs.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wells, Storm Drainage Utilities.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents