Similar Projects
East Selmon Expressway Slip Ramps Design-Build
Design
Tampa, FL

Continuing Contract for Miscellaneous Concrete Flat Work
Term Contract
Post-Bid
Temple Terrace, FL

Street Lights
Infrastructure
Post-Bid
Tampa, FL

I-75 MLK DDI
Results
FL

County-Wide Sidewalk Repair Services
Results
Less than $6,000,000 est. value
FL

Tribal Wide Parking Lot(s) Asphalt Patching, Sealing and Striping Services
Term Contract, Alteration
Post-Bid
Clewiston, Hollywood, Immokalee, Okeechobee, Tampa, FL 33610

Construction, Bruce B. Downs Boulevard Intersections and Sidewalk Improvements
Results
$3,776,048 est. value
Tampa, FL 33608

Design-Build - Lee Roy Selmon Greenway Enhancements from Florida Avenue to west of South Jefferson Street
Infrastructure
Post-Bid
$2,000,000 est. value
Tampa, FL 33646

Streetlight Pole Replacement and Maintenance Services (Sheltered Market Solicitation)
Results
Tampa, FL

District Seven Headquarters and Tampa Operations Center Exterior Lighting Upgrades
Infrastructure
Post-Bid
Tampa, FL

South Coast Greenway Trail, Phase 1A - Shell Point (LAP)
Results
$2,249,150 est. value
Ruskin, FL 33570

Rivercrest Park Boardwalk Replacement Design-Build
Infrastructure
Post-Bid
$1,089,000 est. value
Tampa, FL 33603

Lighting
Results
$901,500 est. value
FL

Tampa Police Department Impound Lot Relocation Design-Build
Alteration
Post-Bid
Tampa, FL 33603

Performance Highway Lighting Maintenance
Results
$1,625,000 est. value

Reported 07/18/2022 03:28 PM
Project Title

Ingrando Park Parking Lot - F-000851 - City of Houston

Physical Address View project details and contacts
City, State (County) Tampa, FL 33606   (Hillsborough County)
Category(s) Heavy and Highway, Outdoor Lighting
Sub-Category(s) Roadway Lighting, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value $1,220,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove the existing parking lot and provide larger new concrete surface parking lot to accommodate the heavy use this park experiences. Parking lot to include security pole lighting. As of July 08, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents