Similar Projects
Kontrolmatik Technologies Lithium-Ion Battery Factory
New Construction, Infrastructure
Conception
$279,000,000 CJ est. value
Walterboro, SC 29488

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Repairs to Bay Creek Park Pier
Infrastructure
Bidding
$300,000 CJ est. value
Edisto Island, SC 29438

On-Call Sidewalk Repair-District 6
Term Contract, Infrastructure
Post-Bid

Full Depth Patch-District 6
Infrastructure
Post-Bid

I-95 Loop Project Streetscape Phases 2 and 10
Infrastructure
Results
Walterboro, SC 29488

I-95 Loop Project Resurfacing
Infrastructure
Results
Walterboro, SC 29488

Harrelson Building - New Entrance and Improvements Project
Renovation, Infrastructure
Bidding
$200,000 CJ est. value
Walterboro, SC 29488

Parking Lot Repairs Colleton County Middle School (CCMS) and Thunderbolt Career and Technology Center (TCTC)
Infrastructure
Post-Bid
$300,000 est. value
Walterboro, SC 29488

Gadsden Loop Neighborhood Revitalization Sidewalk Project
Infrastructure
Results
Walterboro, SC 29488

Road Work- Gun Bluff Road Bridge Replacement
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Edisto Island, SC 29438

Sewer Upgrades - Sub-Systems 1 East & 3 CONTRACT II
Infrastructure
Post-Bid
$700,000 CJ est. value
Walterboro, SC 29488

Venture Park Water and Wastewater Improvements
Infrastructure
Results
SC

Edisto Beach Groin No. 2 Repair
Infrastructure
Post-Bid
$135,250 CJ est. value
Edisto, SC 29438

Reconstruction - I-95 Districts 6 and 7
Infrastructure
Results

Last Updated 12/22/2022 05:02 PM
Project Title

Arc/Billow Drainage Improvements

Physical Address View project details and contacts
City, State (County) Edisto, SC 29438   (Colleton County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $259,138 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of stormwater piping and associated drainage structures at intersection of Murray Street and Billow Street and near intersection of Lee Street and Billow Street; possible utility relocation associated with installation of proposed stormwater structures; removal and replacement of pavement and sidewalk; grading and restoration of site; and all other associated activities. : Providing improved drainage infrastructure near intersection of Myrtle Street and Billow Street and Lee Street and Billow Street. The town of edisto beach plans to replace the existing storm drainage system crossing myrtle street and lee street with a larger capacity system. this will be done in an effort to improve drainage conditions in the area and mitigate flooding that is currently being experienced. Owner anticipates that the Project's total base bid price will be approximately $230,000. The Project has an expected duration of 120 days. *Prospective Bidders are required to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents