Similar Projects
C Station Wastewater Lift Station Replacement - City of Johnson City
New Construction, Renovation
Conception
Less than $3,400,000 est. value
Johnson City, TN 37615

Meadowbrook Lift Station Upgrade Construction - Town of Smyrna
Renovation
Conception
$7,000,000 CJ est. value
Smyrna, TN 37167

RFQ - Relief Well Maintenance Services
Term Contract
Bidding
Memphis, TN 38103

Melton Hill Raw Water Intake Improvements
Renovation, Infrastructure
Bidding
$600,000 CJ est. value
Knoxville, TN 37902

Shaw Filter Valve Replacement
Renovation
Post-Bid
Cordova, TN 38018

Raw Water Pump Station Upgrades
Renovation
Post-Bid
Whitwell, TN

Influent Pumping Station
Renovation
Results
$330,000 est. value
Savannah, TN

Shady Oaks Pump Station Improvements
Renovation
Results
$600,000 est. value
Millington, TN 38053

Tiftonia Pump Station #1 Safety Upgrade - City of Chattanooga
Renovation
Conception
$5,150,000 CJ est. value
Chattanooga, TN 37402

2021 CDBG and ARPA Sewer System Improvements
Infrastructure
Bidding
$3,000,000 CJ est. value
Englewood, TN 37329

Construction of the Tom Fuller Lift Station and Force Main
New Construction, Infrastructure
Post-Bid
$390,000 est. value
Rockwood, TN

Fort Hudson Pump Station Improvements
Renovation
Results
$600,000 est. value
Dyersburg, TN

Tiftonia Pump Station #3 Safety Upgrade - City Of Chattanooga
Renovation
Conception
$3,075,000 CJ est. value
Chattanooga, TN 37402

Industrial Park Sanitary Sewer Pump Station and ForceMain
New Construction, Infrastructure
Bidding
$400,000 CJ est. value
Loretto, TN 38469

Talbott Kansas Pump Station Submersible Pumps
Term Contract
Post-Bid
Talbott, TN 37877

Last Updated 08/12/2023 03:32 AM
Project Title

Water System Improvements - South Industrial Park Water Booster Station

Physical Address View project details and contacts
City, State (County) Pulaski, TN 38478   (Giles County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $662,027 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

CONTRACT 23-01 SOUTH INDUSTRIAL PARK WATER BOOSTER STATION - Slab mounted pre-fabricated water booster station with fiberglass enclosure Site Piping including Pump Discharge Control Valve Pit and connections to existing facilities Site grading, fencing and appurtenances. The allotted construction time is 120 calendar days. liquidated damages for non-completion are $1,000 per calendar day. The successful bidder is required to furnish both an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price. All bidders must be licensed general contractors as required by the Contractor's Licensing Act of 1976 of the General Assembly of the State of Tennessee and qualified for the type of construction being bid upon. materials and labor for the masonry portion of the construction project exceeds one hundred thousand dollars ($100,000). related statutes and regulations to that end that no person shall be excluded from participation in or be denied benefits of or be subjected to discrimination under any program or activity receiving Federal financial assistance or any other funding source on the grounds of race, color, sex, national origin, or ancestry. By virtue of submitting a response to this solicitation, bidders agree to comply with the same non-discrimination policy. DAVIS-BACON ACT and AMERICAN IRON AND STEEL REQUIREMENTS: This project is funded by a grant from the U.S. Department of Commerce Economic Development Administration (EDA). Inquiries should be directed to Daniel G. Tribble, P.E., Project Manager, email danielt@jrwauford.com.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents