Similar Projects
Last Updated | 12/07/2020 08:54 AM |
Project Title | Fy21 Maintenance Dredge, Baltimore Harbor and Channels |
Physical Address | View project details and contacts |
City, State (County) | Baltimore, MD (Baltimore County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Dredging |
Contracting Method | Competitive Bids. |
Project Status | Pre-Solicitation |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 to $25,000,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Firm-fixed-price construction contract for Maintenance Dredge, Baltimore Harbor and Channels, Maryland: maintenance dredging portions of the Craighill Angle and Swan Point Federal Navigation Channels which are located in a heavy commercial waterway supporting the Port of Baltimore. It is anticipated the work would be performed in the Winter - Spring of 2021 and would consist of dredging Craighill Angle to a required depth of 51 feet MLLW with one foot of allowable overdepth and dredging Swan Point to a required depth of 35 feet MLLW with one to two feet of allowable overdepth. The dredging involves removal of up to 1,620,000 cubic yards of material, including allowable overdepth dredging. The material will be placed at the Poplar Island Environmental Restoration Project, Talbot County, Maryland. The estimated cost of the work is up to $18,000,000. The equipment required for this work commonly consists of two 40 plus cubic yard clamshell dredges, one 24-30 inch hydraulic unloader, six to eight large tugs, six to eight 2,500 – 6,000 cubic yard material scows, and appropriate attendant plant and pipeline. The anticipated performance period for the above described dredging and placement should not exceed 110 calendar days from receipt of Notice-to-Proceed. In order to allow for proper drying/consolidation of the dredged material at Poplar Island, a dredge material placement time of year restriction of June 15 – September 30 will be enforced. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |