Last Updated | 11/18/2022 11:07 AM |
Project Title | Ag Shop Additions and Alterations At Hubbertville High School |
Physical Address | View project details and contacts |
City, State (County) | Fayette, AL 35555 (Fayette County) |
Category(s) | Education, Heavy and Highway |
Sub-Category(s) | Middle/Senior High School, Site Development |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding Closed, Construction start expected December 2022 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Architect |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Plans and specifications are for viewing purposes only. Official sets must be obtained from McKee and Associates For Ag Shop Additions and Alterations At Hubbertville School. 1. Confine operations at the site to the areas permitted under the Contract. Portions of the site beyond areas on which work is indicated are not to be disturbed. Conform to applicable rules and regulations affecting the work while engaged in project performance. See site plan for ingress and egress to the site, or if not indicated, same shall be as designated by the Architect. 2. Keep existing public roads, driveways and entrances serving the premises clear and availableat all times. Do not use these areas for parking or storage of materials. Remove dirt, mud, debris, etc., from site, sidewalks, streets, and public right-of-way as it occurs. 3. Do not unreasonably encumber the site with materials or equipment. Confine stockpiling of materials and location of storage sheds and or designated storage areas as indicated. 4. Lock automotive type vehicles, such as passenger cars and trucks and other mechanized or motorized construction equipment, when parked and unattended, so as to prevent unauthorized use. Do not leave such vehicles or equipment unattended with the motor running or the ignition key in place. 5. The Owner, and their representatives, the Architect and their Consultants, as well as authorities having jurisdiction will require site accessibility for inspections, observations, and perhaps other purposes, related to the planned new construction. All Contractors shall assist in such accessibility, to at least the point of providing and maintaining accessible dry paths to work in progress. 6. Furnish and install by contractor temporary barricades, fencing, etc., as indicated or otherwise required, to restrict pedestrian and vehicular traffic from construction operations, including in part, Owner's staff, the public, students, children, and residents of the adjacent residential neighborhoods. 7. Construction operations shall not affect in any manner, the on-going operations of the Owner, immediately adjacent facilities, adjacent property owners or businesses, or others. Refer to Division 1 Section "Special Conditions" for additional information and requirements regarding coordination with Owner's activities, etc. 8. Construction equipment shall not come in contact with or swing over existing facilities to remain, public areas, occupied buildings, right-of-ways, etc., which are to remain. 9. All contractors and their employees shall limit any discussion of the Work of this project to the Owner's representatives named in the front of this Project Manual, Consultants employed, inspecting authorities with jurisdiction, and the Architect. In no instance shall this project be discussed with others, except as may otherwise be indicated herein. 10. Parking on-site, if any, shall be limited to the "staging areas" indicated on the Drawings, or if not indicated, as mutually agreed between the Architect and Contractor at the Pre-Construction Conference. 11. Smoking or other use of tobacco products shall not be permitted within the structure of the Building, Owner's facilities or on roofs. 12. The use or presence of alcohol and/or other debilitating substances shall not be permitted in the construction of the building and or on the project site. 13. Firearms and/or other weapons shall not be permitted on the project site. 14. The Contractor shall furnish necessary temporary toilets for all work forces on the job site. |
||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |