Similar Projects
2021 Curb Replacement
Conception
$400,000 est. value
Cedar Rapids, IA

6th Street South West from 76th Avenue to 2000 South
Conception
$3,170,000 est. value
Cedar Rapids, IA 52404

2022 Street Improvements
Infrastructure
Bidding
$928,313 est. value
Knoxville, IA

City Hall Parking Lot Expansion
Infrastructure
Bidding
$242,289 est. value
Ames, IA 50010

Easton Valley High School Parking Lot
Infrastructure
Post-Bid
Preston, IA 52069

10th Avenue Sidepaths
Infrastructure
Post-Bid
IA

Marshall Street Reconstruction 2021 Washington Street to Jefferson Street
Results
$510,000 est. value
Prairie City, IA 50228

High Trestle Trail Trailhead Parking Lot
Results
Ankeny, IA 50023

Bettendorf Road Repairs For 18Th Street
New Construction, Alteration
Pending Verification
Bettendorf, IA 52722

Cherokee Trail Phase 2B from Cherry Hill Park through Cherokee Park
Conception
$3,000,000 est. value
Cedar Rapids, IA 52405

2022 Rainbow Drive Improvements
Infrastructure
Bidding
Sheldon, IA

Riverfront/Downtown Revitalization
Renovation, Infrastructure
Post-Bid
$17,655,000 est. value
Burlington, IA

Gilbert Court Sidewalk Infill
Results
Iowa City, IA

Lindale Trail Phase I from Council Street to E/o C Avenue North East
Conception
$2,600,000 est. value
Cedar Rapids, IA 52407

PCC Sidewalk - Trail
Infrastructure
Bidding
IA

Last Updated 12/22/2021 05:57 AM
Project Title

PCC Sidewalk/Trail

Physical Address View project details and contacts
City, State (County) IA   (Black Hawk County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Route: Marina Recreational On Cedar River Marina Recreational Trail Enhancements, .20 Acre Clearing & Grubbing 1,311.00 Linear Foot Electrical Curcuits 1,308.70 Square Yard Engineering Fabric 390.00 Cubic Yard Excavation Class 10 2,500.00 Cubic Yard Excavation Class 13 180.00 Ton Granular Backfill 4.00 Each Handhole 870.00 Square Yard Hot Mix Asphalt 5.00 Each Intakes & Manholes/Utility Access 13.00 Each Lighting Poles 423.00 Cubic Yard Modified Subbase 41.00 Station Pavement Markings 1,216.40 Square Yard Pavement, p.c.c. 28.50 Linear Foot Posts, Metal, For Signs 37.00 Linear Foot Rail, Metal 550.00 Square Yard Recreational Trail, Pcc 26,817.00 Pound Reinforcing Steel 4,339.00 Square Yard Removal Of Pvmnt/Drives/Sdwk 234.40 Cubic Yard Retaining Wall 1,200.00 Ton Revetment 1.00 Acre Seeding & Fertilizing 200.00 Linear Foot Sewer Sanitary 175.00 Linear Foot Sewer, Storm 5.68 Station Shoulder Finishing 19.00 Square Foot Signs, Type a 1.00 Acre Stabilizing Crop, Seed & Fert. 309.40 Cubic Yard Structural Concrete 700.00 Cubic Yard Topsoil, Strip/Salvage/Spread 23.00 Each Trees

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents