Similar Projects
HVAC System at the Public Works Garage
Post-Bid
Burlington, NJ 08016

Maple Shade School District Independent Mechanical System Testing Adjusting and Balancing Services - Ralph J. Steinhauer Elementary School, Maude Wilkins Elementary School and Howard Yocum Elementary School and Maple Shade High School
Post-Bid
Maple Shade, NJ 08052

Lumberton Middle School Roof Top Units
Results
$189,000 est. value
Lumberton, NJ 08048

Lumberton Bobby's Run School Cooling Tower Refurbishment
Results
$69,540 est. value
Lumberton, NJ 08048

HVAC and Mechanical Products
Term Contract
Post-Bid

Levitt Intermediate School HVAC System Improvements
Results
Willingboro, NJ 08046

Qualified HVAC Contractors
Term Contract
Post-Bid
Trenton, NJ

2020 HVAC Improvements at Various Locations
Results
$2,949,376 est. value
Cranbury, East Rutherford, Kearny, Milltown, Mount Laurel, New Brunswick, Runnemede, Sayreville, Swedesboro, Westampton, Woodbridge, NJ

Hydrogen Peroxide Air Filtration & Disinfection Products
Post-Bid

Performing Arts Center Chiller Replacement at Burlington Township High School
Results
$185,000 est. value
Burlington, NJ 08016

Weatherization Energy Conservation Project 2021-2022
Post-Bid

Riverside High School and Middle School Alterations - HVAC Construction
Results
Riverside, NJ 08075

Installation of 11 low voltage UV sanitizing modules in existing HVAC equipment
Alteration
Post-Bid

Install Ductless Multi Zone Heat Pump
Results
McGuire AFB, NJ 08640

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Last Updated 12/13/2021 04:14 PM
Project Title

Bldg. 562 Air Duct Cleaning

Physical Address View project details and contacts
City, State (County) NJ   (Burlington County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor shall provide all personnel, equipment, tools, materials, supervision, and other items necessary to provide duct cleaning throughout building 562.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents