Similar Projects
Design-Build Neabsco-Potomac Commuter Parking Project
New Construction
Post-Bid
$53,328,850 est. value
VA

Pedestrian Improvements
Post-Bid
Hamilton, VA 20158

HSIP Pedestrian Improvements at Signalized Intersections Phase 1B
Results
Richmond, VA 23221

HSIP Pedestrian Improvements at Signalized Intersections Phase 1B
Results
Richmond, VA 23221

Construct New Terminal Building Site Work - Phase 1
Construction
Winchester, VA 22602

Construct New Terminal Building Site Work - Phase 1
Construction
Winchester, VA 22602

Old Courthouse Road Pedestrian Access Improvements
Post-Bid
Vienna, VA

TAP Sidewalk Improvements
Results
Culpeper, VA 22701

Waynesboro Marketplace - Sitework
New Construction
Construction
Waynesboro, VA 22980

Sidewalk Repair - Edinburg Residency
Term Contract
Post-Bid

Granby Street Bike Bypass at Riverview
Results
Norfolk, VA

Transportation Alternative Program Sidewalk Improvements
Post-Bid
Culpeper, VA

Dulles Transit Center Renovation
Renovation
Results
VA

Y1PZ--Expand Parking Lot T
Post-Bid
$500,000 to $1,000,000 est. value
Salem, VA 24153

FY 21 Concrete
Results
Less than $341,875 est. value
Roanoke, VA

Last Updated 04/22/2022 12:44 AM
Project Title

Oceanfront Water Meter Vault Replacement Phase I

Physical Address View project details and contacts
City, State (County) Virginia Beach, VA   (Virginia Beach City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sidewalks/Parking Lot, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work under this phase of the project includes mobilization of equipment and personnel, demobilization, removal of existing meter vaults, site demolition, excavation and backfill, installation of 55 new meter vaults, removal, and replacement of sidewalk (material and labor), traffic control, test pits, utility coordination, removal and replacement of plants/landscaping, and site restoration as necessary to provide a complete vault installation as shown in the contract drawings. Contractor shall verify the type of material, dimensions, locations, depths, and size of all meter vaults listed in the contract documents prior to installation.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents