Project Title | I-94 Lift Station And Forcemain Upgrade - S-024 - City of Lake Elmo |
Physical Address | View project details and contacts |
City, State (County) | Lake Elmo, MN 55042 (Washington County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Conceptual Design, Construction start expected September 2024 |
Bids Due | View project details and contacts |
Estimated Value | $2,050,000 [brand] Estimate |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Met Council Gravity Sewer Extension: A regional gravity sewer extended along the north side of I-94 from the current MCES 1-WO-500 (aka WONE) connection point in Oakdale east toward the Lake Elmo corporate boundary. The route would roughly follow the alignment of the current City of Oakdale gravity line that Lake Elmos lift station utilizes, but be extended further to the east. The exact terminus of the gravity line needs to be determined based on elevation survey and other investigations during preliminary design. The I-94 lift station would continue to pump through a City-owned forcemain to the MCES gravity sewer connection point. This alternative also includes the replacement of portions of the 1-WO-500 interceptor to accommodate larger ultimate flow rates from Lake Elmo and Oakdale. This project is in included in the City of Lake Elmo's FY 2023-2027 Capital Improvement Plan (CIP). As of June 16, 2023, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |