Similar Projects
HVAC & Facility Systems, Automation, Installation, Service and Related Products & Services in Ohio
Term Contract
Bidding

Guard and Server Room HVAC Improvements Project
Alteration
Bidding
Toledo, OH 43605

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Portable Light Plants and Tow-Behind Air Compressors
Term Contract
Results

Replacement of Duct Heaters HVAC Unit Downtown Concourse
Results
Toledo, OH 43604

HVAC/R Services
Alteration
Post-Bid
Toledo, OH

Renovations Involving the Main Cooling Tower Replacement
Renovation
Results
Less than $180,000 est. value
Maumee, Toledo, OH 43604

Air Handling Upgrades Project, PH II
Alteration
Post-Bid
$1,895,000 est. value
Toledo, OH

Partial Roof Replacement, 3 rooftop HVAC units and 4 Boiler Replacements
Results
Less than $469,257 est. value
Toledo, OH

Fire Station #7 Curb Adapter and Duct Repairs
Results
Toledo, OH

Fire Station #7 Complete RTU Replacements
Results
Toledo, OH

Scott Park Police Condensing Unit and Evaporator Coil Replacement AC Unit
Alteration
Results
Toledo, OH 43607

Design-Build and HVAC Service
Alteration
Results
Toledo, OH

One (1) Engineered Air DJE 40/O Makeup Air Unit
Alteration
Results
Toledo, OH

Last Updated 11/03/2021 02:43 AM
Project Title

Dowling Chiller Replacement

Physical Address View project details and contacts
City, State (County) Toledo, OH 43614   (Lucas County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $444,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

EDGE Participation Goal - 15.0% Replace an existing water cooled chiller and the associated water pump(s) as indicated. The chiller and pump(s) are being upsized. Replace piping and insulation as required to facilitate the equipment replacement. Demolish and remove the existing chiller and pump(s), and piping where indicated. New electrical circuits/equipment as required for new HVAC equipment. Modify existing building automation system controls.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents