Similar Projects
Hidden Meadows
New Construction
Design
Cumberland, RI

Roger Williams Park Mounted Command Site Improvements
Infrastructure
Post-Bid
Providence, RI 02907

Site Improvements at Shawomet Terrace
Infrastructure
Post-Bid
Warwick, RI 02889

Gravel Roadway Reconstruction Of Long House Trail And Royal Burial Ground Trail
Alteration
Post-Bid
Charlestown, RI 02813

Parking Lot Expansion
New Construction
Design
Westerly, RI 02891

Land Clearing and Grubbing
Infrastructure
Results
Tiverton, RI

Carousel Stabilization Project
Infrastructure
Results
East Providence, RI 02915

CSO Phase III A-9 GSI Projects
Infrastructure
Post-Bid
Central Falls, RI 02863

Site Improvements at Kickemuit Village Housing Development
Results
Warren, RI 02885

Site Improvements and Remediation Activities - Wooded Parcel at Tasca Field
Infrastructure
Results
Scituate, RI 02857

Southside Site Work and Grading
Infrastructure
Post-Bid
Warwick, RI

A Foundation to Support A New Pavilion Structure
Post-Bid
Scituate, RI 02857

Demolition of Structures and Site Work at Two Properties
Demolition
Results
Foster, RI 02825

Last Updated 03/23/2022 10:18 AM
Project Title

Site Improvements at Goldsmith Manor

Physical Address View project details and contacts
City, State (County) East Providence, RI 02914   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Work of this Contract comprises of the removal and disposal of the existing asphalt pavement system and curbing in part in its entirety and providing new bituminous asphalt paving system, granite curbing and re-striping. Providing and infilling with new bituminous pavement system patch, sealcoating and re-striping of parking lot and removal of asphalt sidewalks and installation of concrete sidewalks and accessible ramps as noted on the construction documents. The general scope of work shall include (but is not limited to) information as shown on drawings and as specified B. The contractor must provide all material, labor, tools, supplies, equipment, transportation, superintendence, temporary construction of every nature and all other services and facilities necessary to complete the construction for the Owner, including all incidental work as required or described in the contract documents. C. Type of Contract: 1. Project will be constructed under a single prime contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents