Similar Projects
2022 CIPP Rehabilitation Project
Infrastructure
Bidding
Bluffdale, UT

Zone 6 Highway Junction Reservoir 2
Infrastructure
Bidding
$4,700,000 to $5,100,000 est. value
West Jordan, UT 84088

SLC Airport PCC Pavement Joint Seal Program - Deicing Pad Taxiway
Post-Bid
Salt Lake City, UT

Udot AVL (Approved Vendor List)- Hot Mix Asphalt
Term Contract
Post-Bid

300 East (11400 South to 11800 South) Reconstruction Project
Results
Draper, UT 84020

2021 High Density Mineral Bond
Results
South Jordan, UT 84095

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

SR-186; 2100 E. to Stringham Ave
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
UT

Deer Ridge Drive Reconstruction
Alteration
Post-Bid
$980,000 est. value
Draper, UT

City Wide Crack Seal - Project
Results
Cottonwood Heights, UT 84121

SR-266; I-15 To 700 E
Infrastructure
Bidding
$1,500,000 to $3,000,000 est. value
UT

City-Wide Roadway Improvement Project
Infrastructure
Post-Bid
Cottonwood Heights, UT

1500 South Reconstruction From Redwood Road To 2700 West
Results
Salt Lake City, UT

2022 Roadway Rehabilitation Project
Infrastructure
Bidding
Herriman, UT

Y--Price Canyon Recreation Site Road Improvements
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value

Reported 03/23/2022 12:00 AM
Project Title

2022 Pedestrian Ramp Project

Physical Address View project details and contacts
City, State (County) West Valley City, UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruct pedestrian ramps including curb and gutter, waterway, waterway transition structures, grinding concrete and landscape restoration. Reconstruct driveway and approach, including flatwork, sidewalk, patterned concrete park strip and landscape restoration.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents