Similar Projects
Construction of Rawson Hill Dam Rehabilitation Project - Worcester County, Massachusetts
New Construction
Design
$1,000,000 to $5,000,000 est. value
MA

Pine Tree Brook Reservoir Dam Decommissioning and Stream Restoration Project
Renovation, Infrastructure
Bidding
$75,000 est. value
Boston, MA

Spring Street Tide Gate Replacement
Post-Bid
Everett, MA 02149

Muzzy Dam Flow Control Gate Replacement and Dam Repairs Project
Post-Bid
Spencer, MA

Watershops Pond Dam Rehabilitation
Results
$577,810 est. value
Springfield, MA

Cady Brook Diversion Dam
Results
$610,483 est. value
Pittsfield, MA

On-Call Tunnel Repairs Systemwide
New Construction
Post-Bid
Boston, MA

Wachusett Reservoir North Dike and South Dike Instrumentation
Results
Less than $240,000 est. value
West Boylston, MA

Wachusett Dam Bastion Improvements
Renovation
Post-Bid
$4,033,260 est. value
Clinton, MA

Sawmill Pond Dam Rehabilitation
Results
Less than $360,000 est. value
Plymouth, MA

Hydraulic Structures Maintenance and Repairs Annual Contract
Term Contract
Post-Bid
Holyoke, MA

Repairs to Hatchet Pond Dam
Results
$143,000 est. value
Southbridge, MA

North Reservoir Dam Gatehouse and Dam Improvement Project
Renovation
Post-Bid
$4,800,000 est. value
Winchester, MA 01890

Diversion Gates Outlet Modifications - General Bid
Results
$1,277,677 est. value
Agawam, MA

Dam, Levee and Seawall Repair and Removal Grant - Construction
Renovation
Post-Bid
Boston, MA

Reported 02/10/2022 12:00 AM
Project Title

Amelia Earhart Dam Facility Hardening Upgrade

Physical Address View project details and contacts
City, State (County) Somerville, MA 02145   (Middlesex County)
Category(s) Heavy and Highway
Sub-Category(s) Dam/Tunnel
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $4,900,000
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of facilities hardening and flood protection to elevation 122 (MDC) including replacing hatches, doors, manhole covers, limit switches, sump pumps and related piping, repair construction/expansion joints and concrete spall, replacement of building storefront, seal electrical conduits, and two new standby generators.

Details

Dam/Tunnel, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Subgrade Preparation, Excavation, Shoring, Tunneling and Mining, Tunnel Excavation.
Division 35 - Waterway and Marine Construction, Dam Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents