Similar Projects
Urban Core Riverfront Revitalization and Complete Streets - Hart Bridge Expressway and Talleyrand Connector
Post-Bid
Less than $30,962,163 est. value
Jacksonville, FL

Bridge Repairs and Maintenance
Results
$80,000 est. value
FL

Bridge Pile Jackets
Results
Less than $317,683 est. value
FL

Reedy Creek Improvement District - World Drive Extension Construction Project
New Construction
Construction
Lake Buena Vista, Orlando, FL 32830

Skycenter Site Development, Atrium and Pedestrian Bridge
Construction
$66,000,000 est. value
Tampa, FL

R and R Minor Bridges
Results
Less than $1,726,536 est. value
FL

Philippe Park Pedestrian Bridge
Results
$463,335 est. value
Safety Harbor, FL

New Road and Bridge Construction
Results
Less than $192,065,566 est. value
FL

Hoagland Boulevard Segment 2 from North of Shingle Creek Bridge to 5th Street
Results
Less than $25,626,600 est. value
Kissimmee, FL 34741

Williams Park Road Bridge Approach Repair
Results
FL

Business Development Initiative (BDI) Contract Bridge Painting
Results
Less than $405,150 est. value
FL

Minor Bridges
Results
Less than $1,017,417 est. value
FL

I-275 HFB TBNext Section 3
Results

Repairs to Fairway Boulevard/Flamingo Canal Bridge and Memorial Highway/Dick Creek Bridge
Results
Less than $252,998 est. value
FL

Farm Worker's Village Road Culvert/Bridge Replacements
Results
FL

Last Updated 11/29/2018 01:54 AM
Project Title

Draper Lake Pedestrian Bridge Renovation Project

Physical Address View project details and contacts
City, State (County) FL   (Walton County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency - 09/24/18
Owner View project details and contacts
Architect View project details and contacts
Description This project consists of the renovation of the wooden bridge portions of the Draper Lake pedestrian bridge. Incidental construction includes concrete approach slab reconstruction, riprap relocation, pedestrian hand railing, and minor alignment of the asphalt path. Erosion control and construction best management practices are also required. All areas disturbed by construction shall be restored with sod.
Details
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents