Similar Projects
The Gables On Lawrence
New Construction, Infrastructure
Conception
$51,000,000 CJ est. value
Fairhope, AL 36532

Skyline Village Townhomes
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
Fairhope, AL 36532

New Intracoastal Waterway Bridge - City of Orange Beach
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Orange Beach, AL 36542

RFQ Design - Gulf Coast Engineering Research Station - New Building
New Construction, Infrastructure
Bidding
$7,600,000 CJ est. value
Orange Beach, AL 36561

Circle K / Daphne
New Construction, Infrastructure - 10,374 SF
Bidding
$1,500,000 CJ est. value
Daphne, AL 36526

Effluent Outfall Upgrades USDA Rural Development
Post-Bid
Loxley, AL 36551

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Construction of Raw Water Main for Diamante Well
Infrastructure
Results
$277,790 est. value
Daphne, AL

On Call Contractor Services for Water and Sewer
Infrastructure
Results
$30,000 est. value
Fairhope, AL

Beef O' Bradys / Spanish Fort
New Construction, Infrastructure - 6,000 SF
Construction
$2,000,000 CJ est. value
Spanish Fort, AL 36527

Aldi / Daphne
New Construction, Infrastructure
Pending Verification
$3,500,000 CJ est. value
Daphne, AL 36526

Live Oak Estates
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Fairhope, AL 36532

Orange Beach Medical Plaza
New Construction, Infrastructure - 11,000 SF
Design
$6,400,000 CJ est. value
Orange Beach, AL 36561

Robertsdale Water System Improvements
Infrastructure
Bidding
$650,000 CJ est. value
Robertsdale, AL 36567

Canal Road Widening Water Main Relocation (SR-161 to Wilson Boulevard)
Infrastructure
Post-Bid
Orange Beach, AL 36561

Last Updated 09/30/2022 03:02 PM
Project Title

Belforest Water System - Water Main Improvements County Road 13

Physical Address View project details and contacts
City, State (County) Daphne, AL 36526   (Baldwin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Installation of approximately 5,000 linear feet of 12-inch PVC water main, 480 linear feet of 12-inch ductile iron water main, 280 linear feet of 24-inch steel encasement (jack and bore installation), 140 linear feet of 3-inch water main, 35 linear feet of 6-inch welded steel encasement (jack & bore installation), and other related appurtenances This project is being funded by SRF and will require DBE documentation from the low, responsive, responsible bidder no later than 10 days after bid opening. The Issuing Office for the Bidding Documents is Goodwyn Mills Cawood (GMC), 11 N. Water St., Suite 15250, Mobile, AL 36602, ashley.morris@gmcnetwork.com. Prospective Bidders may examine the Bidding Documents at the Issuing Office on Mondays through Fridays between the hours of 8:00 a.m. - 5:00 p.m., and may obtain copies of the Bidding Documents from the Issuing Office as described below. Checks for Bidding Documents shall be payable to GMC.Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Bid security shall be furnished in accordance with the Instructions to Bidders. This Owner is pursuing funds from a Drinking Water State Revolving Fund Loan and will require DBE documentation from the low, responsive, responsible bidder no later than 10 days after bid opening. All participants must comply with all federal requirements applicable to the Loan (including those imposed by the 2014 Appropriations Act and related SRF Policy Guidelines) which the Participant understands includes, among other, requirements that all of the iron and steel products used in the Project are to be produced in the United States ("American Iron and Steel Requirement"). The Owner reserves the right to waive any informalities, or to reject any or all bids, and to award the contract to the best and most responsible bidder. All bidders shall submit, upon request, a list of projects "successfully completed" in the last 5 years, having the same scope of work and approximate construction cost as specified in this project. All bidders must comply with requirements of the Contractor's Licensing Law of the State of Alabama and be certified for the type of work on which the proposal is submitted. Each bidder must deposit with his bid, security in the amount, form and subject to the conditions provided in the Instructions to Bidders. All Bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Engineer; the Bidder shall show such evidence by clearly displaying the license number on the outside of the envelope in which the Proposal is delivered. No bidder may withdraw his bid within 60 days after the opening thereof.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents