Similar Projects
New Science and Technology Center - Carl Sandburg College
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Galesburg, IL 61401

Scooters Coffee / Galesburg
New Construction, Infrastructure - 668 SF
Design
$200,000 CJ est. value
Galesburg, IL 61401

Water System Improvements - Phase II
Infrastructure
Bidding
$900,000 CJ est. value
Williamsfield, IL 61489

Science and Technology Center BP2 - Site Demolition and New Construction
Demolition, New Construction, Infrastructure
Sub-Bidding
$30,000,000 CJ est. value
Galesburg, IL 61401

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

CERL - Farber Drive Entrance Extension
Infrastructure
Results
$337,677 est. value

Resurface Pavement
Infrastructure
Results
Less than $500,000 est. value
Galesburg, IL 61401

New Library Building and Site improvements
New Construction - 70,160 SF
Construction
$13,000,000 to $13,500,000 est. value
Galesburg, IL 61401

2022 Miscellaneous Sidewalk Replacement
Infrastructure
Construction
$290,749 CJ est. value
Galesburg, IL 61401

Greenhouse and Lab Space
New Construction, Infrastructure
Design
$147,000 CJ est. value
Knoxville, IL 61448

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

RR-21-4821 Pavement Repairs
Infrastructure
Results

Furnish and Apply
Infrastructure
Post-Bid
$500,000 CJ est. value
Knoxville, IL 61448

2022 Seal Coating (Black Rock)
Infrastructure
Results
Galesburg, IL

Last Updated 01/27/2023 04:06 AM
Project Title

Sidewalk Improvements

Physical Address View project details and contacts
City, State (County) Oneida, IL 61467   (Knox County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $644,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor to whom an award shall be made pursuant to this procurement shall be subject to all applicable Federal and State laws and regulations, including but not limited to the Illinois acts commonly known as the Illinois Prevailing Wage Act (820 ILCS 130). The submission of the proposal or bid by the Offeror in response to this Advertisement for Bids constitutes an acknowledgment of and an agreement by the Offeror that it understands and will comply with the Illinois Prevailing Wage Act and the Illinois Preference Act (30 ILCS 570). A payment bond and a performance bond are required in connection with this Project. The payment bond shall specifically provide that the Principal must pay all sums of money due or to become due for any labor in accordance with the Illinois Prevailing Wage Act, (820 ILCS 130) Bid tab and contract award information will be available online at website .

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents