Similar Projects
Facilities Services RTU-13 Replacement and Distribution Services RTU-14 Replacement
Post-Bid
Virginia Beach, VA 23456

Woodrow Wilson High School - Cooling Tower and Electrical Switchgear Replacement
Post-Bid
Portsmouth, VA

Roof Top Air Handling Unit
Results
Chesapeake, VA 23323

HVAC Improvement Main Terminal First Floor
Results
Richmond, VA 23250

Air Purification Systems
Post-Bid
Chatham, Pound, Victoria, VA 23936

Emergency and Routine HVAC Maintenance and Repair
Results
Norfolk, VA 23510

Derring Hall Fume Hood Exhaust Fan Replacements at Virginia Tech
Results
Blacksburg, VA 24061

Albemarle County High School HVAC and Waste Water Pumps Upgrade
Results
$1,000,000 to $1,300,000 est. value
VA

Walton Middle School HVAC Upgrades
Results
$500,000 to $1,000,000 est. value
Charlottesville, VA 22903

Air Handling Unit Replacements at Swift Creek Elementary School
Results
Midlothian, VA 23112

HVAC Replacements at Rolfe Middle School and Wilder Middle School
Results
Montrose, VA 23231

Blast Chiller Freezer, Reach-In- Augusta Correctional Center
Results
Charlottesville, VA

Oakwood AHQ Shop HVAC-Lighting Replacement
Results
Richmond, VA 23219

Chiller Replacements
Results
Chester, Midlothian, VA

Chill Water Cooling Tower Replacement
Results
Hanover, VA 23069

Last Updated 06/08/2020 12:43 PM
Project Title

The College William and Mary Law School VAV and HVAC Replacement

Physical Address View project details and contacts
City, State (County) Williamsburg, VA   (James City County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The project is generally described as replacement of Air Handling Unit 2, Return Air Fan 1 and Return Air Fan 2 located in the Marshall-Wythe School of Law basement of mechanical Room. Also included in this project is the replacement of the Variable Air Volume (VAV) bladder style linear diffusers. The VAV linear diffusers replacement work is to be completed on the ground floor and second floor areas identified as the north wing on the building key.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents