Similar Projects
RFP - Consultant Services for Sheehan High School Outdoor Track and Field Improvements
Infrastructure
Conception
$1,900,000 CJ est. value
Wallingford, CT 06492

Storm Drainage Improvements - Town of Madison
Infrastructure
Conception
$500,000 est. value
Madison, CT

Contractor - Steam Supply Double Block and Bleed Station With Bypass Line Installation
Infrastructure
Design
$200,000 est. value
West Haven, CT 06516

State Street Mixed-Use Building
New Construction, Infrastructure, Build-out - 1,000 SF
Design
$28,000,000 CJ est. value
New Haven, CT 06511

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Pavement Preservation Surface Courses
Results
Meriden, CT

Amity High School Parking Lot Replacement Phase III
Infrastructure
Results
$192,974 est. value
Woodbridge, CT 06525

Water Pollution Control Facility Service Building Replacement
Demolition, New Construction, Infrastructure
Construction
$4,000,000 CJ est. value
Waterbury, CT 06708

Trolley Pointe
New Construction, Infrastructure
Pending Verification
$12,000,000 CJ est. value
Derby, CT 06418

Savin Rock Conference Center Brewery Redevelopment
New Construction, Infrastructure - 52,000 SF
Pending Verification
$25,000,000 CJ est. value
West Haven, CT 06516

Route 79 Sidewalk - Concord Meadows to Route 1 - Town of Madison
Infrastructure
Conception
$400,000 est. value
Madison, CT 06443

Coliseum Redevelopment - Phase 1
New Construction, Infrastructure - 16,000 SF
Design
$75,000,000 CJ est. value
New Haven, CT 06510

West End Streetscape Improvements Phase IV
Infrastructure
Post-Bid
East Haven, CT

Paving Services for Middlebury Elementary School
Infrastructure
Results
Middlebury, CT 06762

Last Updated 11/28/2022 09:38 AM
Project Title

Rehabilitation of Burton Road

Physical Address View project details and contacts
City, State (County) Beacon Falls, CT 06403   (New Haven County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $2,460,950 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Question Deadline 10/12/2022 at 10:00 AM ET All questions regarding the specifications must be directed within the Bonfire portal. The Town of Beacon Falls is seeking bids from qualified respondents for the roadway rehabilitation of Burton Road, which includes the removal and installation of a concrete retaining wall, full-depth reconstruction, paving, installation of new concrete curbing, driveway aprons, monolithic concrete sidewalks/concrete sidewalks and guiderail, storm drainage modifications, and new signs and pavement markings. Respondents must have demonstrated experience in completing similar work (as described in the contract plans, standard specifications and special provisions) and adhere to standards and requirements (State of Connecticut Department of Transportation Standard Specifications for Roads, Bridges, Facilities and Incidental Construction Form 818, dated 2020 and latest supplements, and Town of Beacon Falls standards) typical for such work. Beacon Falls is seeking bids from qualified respondents for the roadway reconstruction of Burton Road, which includes the removal and installation of a concrete retaining wall, full-depth reconstruction, paving, installation of new concrete curbing, driveway aprons, monolithic concrete sidewalks/concrete sidewalks and guiderail, storm drainage modifications, and new signs and pavement markings. Bid Bond: 5% Performance Bond: 100% Payment Bond: 100% TIME SCHEDULE & PENALTIES: The project shall be completed within 240 calendar days from issuance of the Notice to Proceed. Liquidated damages charge to apply will be one thousand two-hundred dollars ($1,200.00) per calendar day, in which work is extended beyond the allotted calendar days.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents