Similar Projects
Reconstruction of College Avenue - City of Carmel
Alteration
Conception
$250,000 est. value
Carmel, IN

Midtown At Westfield
New Construction, Infrastructure
Conception
$600,000,000 CJ est. value
Westfield, IN 46074

AutoZone #5765 / Indianapolis
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Indianapolis, IN 46217

Towns at Union PUD
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Westfield, IN 46074

Noblesville Ambulatory Surgery Center
New Construction, Infrastructure - 39,577 SF
Bidding
$1,000,000 CJ est. value
Noblesville, IN 46060

River Heritage Park Forest Mitigation Project
Infrastructure
Bidding
$300,000 CJ est. value
Carmel, IN 46033

Indiana Transportation Museum Site Remediation
Infrastructure
Post-Bid
Noblesville, IN 46060

Rehabilitate Hangar Access Taxiways
Infrastructure
Post-Bid
$250,000 CJ est. value
Fishers, IN 46038

HHSC Conference Center Site Improvements
Infrastructure
Results
$500,000 est. value
Arcadia, IN 46030

Noblesville Schools - Storage Buildings
New Construction
Results
Noblesville, IN 46060

Menards Warehouse
Addition - 32,267 SF
Construction
Carmel, IN 46033

Gorman & Bunch Orthodontics
New Construction, Infrastructure - 9,000 SF
Construction
$2,000,000 CJ est. value
Fishers, IN 46037

Woods Robinson Briggs
New Construction, Infrastructure - 318,000 SF
Pending Verification
$100,000,000 CJ est. value
Westfield, IN 46074

Containers on College
New Construction, Infrastructure - 15,800 SF
Pending Verification
$5,000,000 CJ est. value
Indianapolis, IN 46202

Retreat at Morse
New Construction, Infrastructure
Conception
$18,400,000 CJ est. value
Noblesville, IN 46062

Last Updated 06/09/2023 09:08 AM
Project Title

Billericay Park Public Works Operation Barn

Physical Address View project details and contacts
City, State (County) Fishers, IN 46038   (Hamilton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Site Development, Warehouse/Storage
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bids are to be submitted on the Bid Form as provided in the Project Manual and on Indiana State Board of Accounts Form No. 96 (revised 2013) as required by the statutes of the State of Indiana. Bidders shall submit financial data, statement of experience, proposed plan for performing the Work and the equipment the Bidder has available for the performance of the Work, along with a properly signed Affidavit of Non-Collusion as required by Form No. 96. Construction plans and details to build a barn 60' x 40' with a 6" concrete floor. Price the 6" concrete floor as an alternate. Building to include 2 garage doors and 2 walkthrough man doors. Color of building sandstone sides and Fishers green roof. Colors to be determined at award of contract. The Work shall be completed by certified / qualified Contractor(s) and Subcontractor(s) for the Project all as required by the Bidding Documents which have been assembled into a bound Project Manual and consists of: (1) Cover Page (2) Notice to Bidder (3) Instructions to Bidder (4) Bid Form (5) Agreement (6) Notice of Award (7) Manufacturers List (8) Subcontractors List Contract Award: Any Bid may be withdrawn prior to the deadline for receipt of Bids, but no Bidder shall withdraw its Bid within sixty (60) days after the opening of the Bids. If a contract is awarded, it will be to the lowest responsible and responsive bidder in accordance with Indiana Code 36-1-12-1 et seq. The Owner, however, reserves the right to reject and/or cancel any and all Bids, solicitations and/or offers in whole or in part as specified in the solicitation when it is not in the best interests of the Owner, and waive any informalities, discrepancies, omissions, variances, or irregularities in bids received in its sole discretion. The Bid Bonds and certified checks of unsuccessful bidders will be returned upon selection of the successful Bidder, execution of the Agreement, and provision of the required Performance and Payment Bonds and Certificate of Insurance. All questions concerning bidding shall be directed to Eric Steiner, Assistant Director of Public Works via email at steinere@fishers.in.us and copied to Eric Pethtel, Director of Public Works at pethtele@fishers.in.us. Bid Documents - Review: Construction will be in accordance with the Bidding Documents, which may be viewed at 1. City of Fishers Department of Public Works, 10212 Eller Road, Fishers IN 46038 Bidders shall assure that they have obtained complete sets of Bidding Documents and the Project Manual and shall assume the risk of any errors or omissions in Bids prepared in reliance on incomplete sets of Bidding Documentmailto:steinere@fishers.in.uss or Project Manual. Bids must be submitted on the forms contained in the Project Manual and must contain the names of every person or company interested therein. Bid Security: Each Bid shall be accompanied by bid security in the form of a Bid Bond as provided in the Project Manual in the amount of ten percent (10%) of the total Bid amount, including alternates with a satisfactory corporate surety qualified to do business in the State of Indiana or by a certified check made payable to the City of Fishers, on a solvent bank in the amount of ten percent (10%) of the amount of the total Bid including alternates. The Bid Bond or certified check shall be security that the successful Bidder will, within ten (10) calendar days or such other time specified by Owner from the acceptance of the Bid, execute the Agreement and provide the required Payment and Performance Bonds, included in the Project Manual and Certificate of Insurance. A Performance Bond with good and sufficient surety as required by the Owner on the Form provided in the Project Manual, shall be required of the successful Bidder in an amount equal to at least one hundred percent (100%) of the Contract Sum, conditioned upon the faithful performance of the Agreement. The surety of the Performance Bond may not be released until one (1) year after the Owners final settlement with the Contractor. The Contractor shall provide a Payment Bond with a good and sufficient surety as required by the Owner on Form provided in the Project Manual, in an amount equal to one hundred percent (100%) of the Contract Sum. The Payment Bond is binding on the Contractor, its subcontractors, and their successors and assigns for the payment of all indebtedness to a person for labor and services performed, material furnished, or services rendered. The Payment Bond must state that it is for the benefit of the subcontractors, laborers, material suppliers, and those performing services. The surety of the Payment Bond may not be released until one (1) year after the Owners final settlement with the Contractor. All out-of-state bidder corporations must have a Certificate of Authority to do business in the State. Application forms may be obtained by contacting the Secretary of State, State of Indiana, Statehouse, Indianapolis, Indiana 46204.

Details

2,400 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents