Similar Projects
Parkersburg - Williamstown
Infrastructure
Design
$3,000,000 CJ est. value
Mineral Wells, WV 26150

Parkersburg - Williamstown
Infrastructure
Design
$3,000,000 CJ est. value
Mineral Wells, WV 26150

RFP D/B - Pedestrian Bike Facilities - Grand Central Ave
Infrastructure
Bidding
$500,000 CJ est. value
Vienna, WV 26105

RFP D/B - Pedestrian Bike Facilities - Grand Central Ave
Infrastructure
Bidding
$500,000 CJ est. value
Vienna, WV 26105

Farm Demolition Project
Demolition, Infrastructure
Post-Bid
$70,000 est. value
Parkersburg, WV 26104

Spencer's Landing Fill Project
Infrastructure
Post-Bid
$70,000 CJ est. value
Vienna, WV 26105

Deep Injection Roadway Settlement Stabilization
Infrastructure
Results

Highland Avenue
Infrastructure
Results
WV

Chemours Hydrogen Production Facilities / Washington
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Washington, WV 26181

USMC PFC D Marshall Mem Br
Demolition, New Construction, Infrastructure
Design
$6,110,000 CJ est. value
Mineral Wells, WV 26150

Resurfacing - US 50
Infrastructure
Bidding
$650,000 CJ est. value
North Parkersburg, WV 26104

Williamstown AASF-1 Taxiway and Apron Repairs
Infrastructure
Post-Bid
$500,000 CJ est. value
Williamstown, WV 26187

Belleville - Lubeck Rd
Infrastructure
Results
WV

Parkersburg Cbd Tl Ren +29
Infrastructure
Design
$800,000 CJ est. value
Washington, WV 26181

Landlord Work - Grand Central Mall / Parkersburg
Build-out, Infrastructure
Post-Bid
$200,000 CJ est. value
Parkersburg, WV 26101

Last Updated 07/08/2023 03:36 AM
Project Title

Pedestrian/Bike Facilities - East street ADA

Physical Address View project details and contacts
City, State (County) Parkersburg, WV 26101   (Wood County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $472,083 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Replacing sidewalk and curb ramps to meet ADA compliance. All work will be within the existing right of way. SHPO letter of 9/2/2020 states curb cuts will have no adverse effect on cultural resources as long as they adhere to ALL of the following stipulations: (1) curb cuts will be installed in existing sidewalks, (2) curb cuts will be installed within existing R/W, (3) curb cuts will be confined to previously disturbed areas, per the 2015 PA; (4) the curb cuts will neither remove nor disturb any brick or stone material that is 45 years or older, (5) the curb cuts will neither remove nor disturb any concrete sidewalk material that is 45 years or older and has any known or demonstrable association with events or individuals who have made significant contributions to the broad patterns of our nation or state's history (such as WPA markings, etc.), (6) curb cuts will require no installation of new appurtenances that will rise more than 6" above the current grade of the existing sidewalks, and (7) curb cut installation will require no tree removal. If any of the following stipulations cannot be met, the project will need to be resubmitted to DSN for SHPO. No effect per FHWA email 2/4/2022. Pedestrian/bike facilities East street ADA +3 Midpoint County: wood Bidder Must Provide Written Assurance of Meeting Goal on Form in Proposal. Proposals will be received from prequalified and West Virginia licensed contractors only except that on Federal-Aid Projects a contractors' license is not required at time of bid, but will be required before work can begin. Registration is required with the Department of Administration, Division of Purchasing, in accordance with Chapter 5A, Article 3, Section 12 of the West Virigia Code. All contractors submitting bids on project(s) must include one of the following forms properly executed with each proposal: Proposal Guaranty Bond, Cashier's Check, or Certified Check for $500.00 or 5% of the total bid, whichever is greater The West Virginia Department of Transportation, Division of Highways reserves the right to defer, delay or postpone the date for receiving and publicly opening proposals for any project designated in this advertisement, without the necessity of renewing such advertisement. All bidders holding valid bidding proposals will be notified of such deferment, delay or postponement and the date that proposals will be received and publicly opened. WVDOT - Call Order : 009 Pedestrian/bike Facilities - Main Street

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents