Similar Projects
Shepherd Junior High Cooling Tower Repairs
Term Contract
Post-Bid
Mesa, AZ 85205

Franklin at Brimhall Junior High Cooling Tower Repairs
Term Contract
Post-Bid
Mesa, AZ 85210

VA Tucson Replace AHUs for Critical Care and Sterile Processing
Results
$2,000,000 to $5,000,000 est. value
Tucson, AZ 85723

HVAC Support Maintenance for Nodes
Results
Fort Huachuca, AZ 85613

Kino Junior High Cooling Tower Repairs
Term Contract
Post-Bid
Mesa, AZ 85203

J--TUMA HVAC Replacement for PR 40432825
Results
$25,000 to $100,000 est. value
AZ

HVAC Supplies
Term Contract
Post-Bid
Tucson, AZ 85701

SFB Washington Central Plant Parts and Repairs
Results
Phoenix, AZ 85301

Pomeroy Elementary Cooling Tower Repairs
Post-Bid
Chandler, AZ 85224

Preventive Maintenance and Repair of Screw Chillers
Results
Mesa, AZ 85210

Mesa Center For Success At Jordan Cooling Tower Repairs
Post-Bid
Chandler, AZ

The Purpose of this Solicitation is to Acquire A/C
Results
Parker, AZ 85344

Ishikawa Elementary Cooling Tower Repairs
Term Contract
Post-Bid
Mesa, AZ 85213

45--Replace Visitor Center HVAC Chiller Unit
Results
Coolidge, AZ 85228

On-Call/Emergency Services
Post-Bid
Marana, AZ 85653

Last Updated 03/18/2021 04:30 PM
Project Title

Desert Mesa Chiller Plant Replacement

Physical Address View project details and contacts
City, State (County) Yuma, AZ 85365   (Yuma County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

To provide all labor, materials, equipment, and services for replacement of the Desert Mesa Chiller Plant Replacement for the Yuma Elementary District No. 1. The Mechanical scope of work for this project includes removal of two (2) existing water-cooled chillers, One (1) wall mounted exhaust fan, Two (2) primary chilled water pump, two (2) secondary chilled water pumps, and associated piping and VFD’s. The addition of two (2) new water-cooled chillers and associated VFD’s, two (2) New primary chilled water pumps and VFD'S, two (2) new secondary chilled water pumps, one (1) new wall mounted continuous run exhaust fan, one (1) new wall mounted purge exhaust fan, new machine room refrigerant detection systems, and all associated piping and controls to produce a fully operational central Plant. (Existing chilled water controls and sequence to remain and adjusted as required.) The Structural scope of work for this project includes anchoring of new chillers and steel angle lintel for new concrete wall penetration for exhaust. The Electrical scope of work for this project includes all required Electrical support and requirements to provide power to new Chillers, secondary pumps, purge and continuous exhaust fans, VFD'S, and refrigerant Detection System. During Pre-bid walk through, pay close attention to the existing chiller and cooling tower layout with regards to the removal and replacement of chillers. Existing cooling tower (CT-1) may need to be removed and replaced after new chiller installation. Alternatively, the chillers can be installed and located through Hall 1090. New chillers disassembly or door modification may be necessary.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Packaged Water Chillers, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents