Similar Projects
Shady Lane and Shady Nook Reconstruction and Hill N' Dale Drainage Improvements
Infrastructure
Bidding
$2,400,000 est. value
Pewaukee, WI 53072

2021 Gramling Lane Culvert Replacement
Post-Bid
Less than $300,000 est. value
Dousman, WI 53118

Culverts and Guardrails
Post-Bid
Waukesha, WI

Shoreline Stabilization
Results
Oconomowoc, WI 53066

Calhoun Road, CTH M to STH 190, Calhoun Road, CTH M to STH 190
Results
WI

Kathryn Court Drainage Improvements
Infrastructure
Post-Bid
$425,000 est. value
Vernon, WI 53186

Concrete Floor Trench Drain and Grate Replacement
Results
Oconomowoc, WI

Pewaukee River Tributary Culvert Replacement Project
Infrastructure
Post-Bid
$450,000 est. value
Sussex, WI 53089

2021 Road Program
Results
Sussex, WI

Sealcoating, Patchwork, Crack Fill/Cross Dips, Cold Mix Asphalt, Shoulder Work, Grading Shoulders, Culvert Replacement and Salt Shed Repair
Infrastructure
Post-Bid
$400,000 est. value
Oconomowoc, WI

Minooka Park Entrance Bypass Lane
Results
Waukesha, WI 53189

2021 Paving and Drainage Program
Results
$700,000 est. value
Wales, WI

Area 1 and 2 Flood Mitigation (Rolling Ridge Ditch Grading)
Results
Waukesha, WI

Recycling Center Retaining Wall Replacement
Alteration
Results
Waukesha, WI

Corporate Drive, Woodbridge and Santa Maria Bridges
Infrastructure
Results
Brookfield, WI

Last Updated 05/05/2022 12:32 AM
Project Title

130th Street Culvert Replacement

Physical Address View project details and contacts
City, State (County) New Berlin, WI 53151   (Waukesha County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work consists of either; pavement removal by milling, base repair, curb and gutter repair, manhole adjustments, and placing asphalt, or pulverizing, removal of excess pulverized material, grading, base repair, manhole adjustments, and placing asphalt. Approximate items of work are listed below: Staking, Traffic Control and Erosion Control, Remove and Replace two 60-inch RCP Culvert Pipes in Streambank, Cast-in Place Concrete Headwalls, Blend Ditch Grade to Culvert Headwalls, Concrete Curb and Gutter, Asphalt Binder and Surface Coarses, Restoration

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents