Project Title | Heating Zone Separation at Holly Center |
Physical Address | View project details and contacts |
City, State (County) | Salisbury, MD 21804 (Wicomico County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | Less than $100,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Cut existing pipe and install new cut off valve, install new actuator and connect to new thermostats, etc. in Health Services building. 2. Each re-heat coil will require an actuator valve, cut off valve, and approximately 3 feet of 3/4''copper pipe, wired to new thermostats to be mounted on the wall for that zone. This will allow the re-heat coil to properly heat the zone separate from the fin tube heat zone 3. Distribute communication cabling to Metasys Control engineer to each unit 4. Contractor will have to sub-contract (and pay directly) Johnson Controls to tie into the existing Metasys Control System for a complete turnkey project |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |