Similar Projects
West Rocks Middle School Proposed Soccer Field Complex
New Construction
Results
$1,461,631 to $2,497,087 est. value
Norwalk, CT 06851

Ymca
New Construction
Conception
$15,000,000 to $40,000,000 est. value
Hamden, CT

UConn Hockey Arena / I-Lot Improvements
New Construction - 97,700 SF
Post-Bid
$53,000,000 est. value
Storrs, CT 06269

Veterans Rally Point
New Construction - 18,000 SF
Conception
$2,500,000 est. value
Norwich, CT 06360

Construction of Press Box at Dedrick Field
Post-Bid
Waterford, CT 06385

All Sports Village
New Construction
Construction
$175,000,000 est. value
Windsor Locks, CT

Ignite Sports Complex
New Construction - 350,000 SF
Design
$13,000,000 est. value
Southington, CT 06489

Site Athletic Facility (Field) Improvements Hartford Public High School
Results
$941,000 est. value
Hartford, CT 06105

Glastonbury High School Athletics Facility
Post-Bid
Glastonbury, CT 06033

Athletic Training Facility
New Construction - 35,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
West Haven, CT 06516

Reported 02/19/2021 12:00 AM
Project Title

Veterans Memorial Park Building Renovation

Physical Address View project details and contacts
City, State (County) West Haven, CT 06516   (New Haven County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Work of project consists of the renovation of the existing building into a new team facility to support athletic activities in the adjacent park. The existing building currently has public toilets and one team room with toilet facilities; these are all to remain. The renovation will convert an existing storage area to a second team room, with toilet facilities. The renovated building will remain unheated, but new ventilation, will be added to both the new team room and the existing team room. New emergency egress doors and new clerestory windows will be added to both team rooms. New lighting is to be provided in the new team room. Some selective demolition is required to remove an interior concrete ramp and a portion of the interior concrete slab as well as cutting openings for the new doors and windows. A limited amount of masonry work is required at the installation of the new doors and windows. The new toilet room walls will be steel studs with gypsum board. The toilet room will be complete with fixtures, toilet partitions, accessories and finishes. The entire new team room, including the exposed underside of the roof deck and wood trusses, walls and floor are all to be painted. The existing building is serviced by an existing 2” water line and sanitary sewer line from Bull Hill Lane to the building.

Details

Athletic Facility, Renovation.
Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents