Similar Projects
500 West - 1560 South to 920 South
Alteration
Conception
$1,800,000 est. value
Provo, UT 84601

Carterville Storm Drain Outfall - City Of Provo
Infrastructure
Conception
Less than $2,500,000 est. value
Provo, UT 84603

Central Park Well Equipping
Infrastructure
Bidding
$150,000 est. value
Smithfield, UT

Jensen Water Improvement District - Water Improvements Project 2021
Post-Bid
Vernal, UT

River Bottom Improvement Project Prequalification
Post-Bid

2020 2000 South PRV Project
Results
Orem, UT 84058

Page Sharmel Water Improvements Project
Results
Less than $1,611,164 est. value
Salt Lake City, UT

Airport Moat Piping and Pump - 1045 - City of Provo
Infrastructure
Conception
$725,000 est. value
Provo, UT 84601

Construction of the 2020 Water Projects
Post-Bid
Brigham City, UT

1700 West Sewer and Water Project
Results
Less than $230,000 est. value
Roy, UT 84067

Freedom boulevard - Center to 300 North (12" Line) - City of Provo
Alteration
Conception
$2,000,000 est. value
Provo, UT 84601

Gerber Water Line Gerber Spring to Gerber Tank
Post-Bid
Midway, UT

Parks and Open Spaces Master Valves and Flow Meters
Results
Clearfield, UT 84015

Pressurized Irrigation Extension Project 2021
Post-Bid
Mapleton, UT

2021 Waterlines Project
Results
Magna, UT

Last Updated 06/24/2022 12:39 AM
Project Title

Replacement of Water Main Pipe

Physical Address View project details and contacts
City, State (County) Ephraim, UT   (Sanpete County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal and replacement of approximately 103' x 6' of asphalt. (vendor responsible for their own measurements) Removal and replacement of approximately 120' of 8" (vendor responsible for their own measurements) water main piping and associated isolation valves, tying into the city water main on 100 N and into the existing 8" piping leading into the building. Removal of curb, gutter and sidewalk associated with pipe removal and replacement. Snow College will replace the curb, gutter and sidewalk in project area. If possible, no trees shall be removed or damaged unless unavoidable. Snow College is extending bids for removal and replacement of about 120' of water main piping to one of the College's buildings. Vendor cannot upload, change or add any extra terms or conditions as per Utah State Procurement Code 63G-6A-604-3-B or they will be disqualified.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents