Similar Projects
Last Updated | 07/13/2021 11:47 AM |
Project Title | 2021 Futsal Court Project |
Physical Address | View project details and contacts |
City, State (County) | Auburn, ME (Androscoggin County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $70,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Futsal Court Pad (approximately 106’x114’) 1. Box cut boundary of futsal court pad to an elevation allowing a build up of 12” A Gravel, 2” 12.5mm HMA, and 1” 9.5mm HMA Surface. 2. Install geotextile fabric at bottom of box cut before placing gravel. 3. Access to the site can be made from Chestnut Street along the jogging path o 1” 9.5mm HMA overlay is proposed for the jogging path if damaged from material transportation. This quantity is included in 9.5mm item. o Overlay area will be determined in the field and start/termination locations shall be sawcut for matching existing pavement. Pavement removal at these two locations are paid under Common Excavation. 4. Loam and seed disturbed areas and as directed. |
||||||||
Details | Park/Playground, New Construction.
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |