Similar Projects
Wastewater Pumping Station Rehabilitations Design-Build
Design
Less than $19,000,000 est. value
Tampa, FL 33602

118th Street and Wilson Boulevard Pump Stations
New Construction
Bidding
$11,000,000 est. value
Jacksonville, FL 32210

Lift Station CA-14 Rehabilitation Improvements Project
Renovation
Bidding
Callaway, FL

Wastewater Pump Station Construction and Rehabilitation Contractor Services Contract
Post-Bid
Maitland, FL

Kaye Street Re-Pump Station Building Expansion
Addition
Post-Bid
West Palm Beach, FL

Replace Sewer Lift Station at USCG Station Panama City, Florida
Results
$250,000 to $500,000 est. value
Panama City, FL 32408

Detroit Boulevard Lift Station 50
Results
Less than $2,500,000 est. value
Pensacola, FL 32514

Packing District Park - Master Lift Station Upgrades
Renovation
Construction
Orlando, FL 32869

Cooper Creek Lift Station Relocation
Renovation
Construction
$1,200,000 est. value
University Park, FL 34201

Rolling Hills Subdivision Gravity Sewer, Lift Station and Forcemain
New Construction, Infrastructure
Bidding
$1,210,000 est. value
Loxahatchee, FL

SRF Wastewater Improvements Phase IIA
Post-Bid
De Funiak Springs, FL 32433

Lift Station #48 Rehabilitation and Force Main Replacement
Results
Less than $300,000 est. value
Cooper City, FL 33329

Effluent Disposal Project
Construction
Chipley, FL

Mid County Lift Station Pump and Panel Improvements
Renovation
Bidding
$460,000 est. value
Port Charlotte, Punta Gorda, FL 33952

Progressive Design Build Services Lift Station 87
Post-Bid
Saint Petersburg, FL 33731

Last Updated 11/09/2021 09:02 AM
Project Title

Dogwood Lane Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Orange Park, FL 32073   (Clay County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Removal of Existing suction Lift pumps, Piping and Electrical. Removal of Portions of Existing gravity sewer System. Install New Modified gravity sewer and Junction manhole. Install New 10' x 11' Diameter Wetwell and Top Slab. Construct new Submersible pumps Value and Piping. Install New Electrical Service and Pumps Control

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents