Similar Projects
Last Updated | 12/21/2022 03:03 AM |
Project Title | Construct Utility Loop North Side of Campus |
Physical Address | View project details and contacts |
City, State (County) | North Las Vegas, NV 89086 (Clark County) |
Category(s) | Government/Public, Heavy and Highway, Medical, Sewer and Water |
Sub-Category(s) | Hospital, Military Facility, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Construction start expected July 2022 , Construction documents |
Bids Due | View project details and contacts |
Estimated Value | $10,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | As per the Owner the project has been cancelled. Editorial Content Team is actively seeking updated information Project no- 593-21-2-5930-0025 Project Title: Construct Utility Loop - North Side of Campus Project Number: 593-19-301 Project Location: VA Southern Nevada Healthcare System, Las Vegas Campus, 6900 N. Pecos Rd., North Las Vegas, NV 89086 Description: The awarded contractor shall provide professional construction services and expertise to construct the first phase Utility Loop infrastructure for the Northeast quadrant of the VA Southern Nevada Healthcare System campus. NAICS Code: 237990 Other Heavy and Civil Engineering Construction Size Standard: $39.5M This acquisition is a 100% Small Business Set-Aside Although not mandatory, all interested firms are STRONGLY encouraged to attend the site visit. See FAR 52.236-27 for scheduled date and time. See attached site visit map for meeting location. Assume masks will be required. The estimated magnitude for this construction project is between $5,000,000 and $10,000,000. This information is provided in accordance with FAR 36.204 and VAAR 852.204. Resultant contract will be awarded in accordance with FAR Part 15 - Contracting by Negotiation. This procurement is Best Value Tradeoff selection process in accordance with FAR 15.101-1. Both a technical proposal and a price proposal are required. Offerors are strongly encouraged to thoroughly read this entire request for proposal. Solicitation Instructions to Offerors, Evaluation of Offers, Basis of Award, Solicitation Provisions, and Representations and Certifications will be physically removed from any resultant award; however, Solicitation Provisions and Representations and Certifications will be deemed to be incorporated by reference in the resultant contract award. Bid Bonds, Payment Bonds, and Performance Bonds are required. The prime contractor Small Business shall comply with subcontracting limitations as defined in 13 CFR 125.6 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |