Similar Projects
Prisoner Holding Area Modifications
Renovation
Conception
Chesterfield, VA

VADJJ New Juvenile Correctional Center
New Construction
Post-Bid
Bon Air, VA 23235

Adult Detention Center Project - Capital Renewal and Electronic Security Packages B, C, D, E and F
Renovation
Post-Bid
Less than $5,000,000 est. value
Fairfax, VA 22030

Comprehensive Maintenance Management and Preventive Maintenance Services for the Hampton Roads Regional Jail
Results
$338,712 est. value
Portsmouth, VA 23701

Job Order Contracting- Prequalified Vendors
Term Contract
Results
Bon Air, VA 23235

Construction Services for Renovations of the Fire Station 5 Building
Renovation, Addition
Post-Bid
$300,000 est. value
Prince George, VA 23875

Henrico Jail West Facility - Roof System Replacement Project
Renovation, Alteration - 90,102 SF
Results
Henrico, VA 23228

Office Renovations
Renovation
Results
Stafford, VA 22554

Coal Elevator Replacement
Alteration
Results
Richmond, VA

Public Safety Building - Kitchen Renovation
Renovation
Results
Newport News, VA 23607

Flooring and Countertops for Roanoke County/Salem Jail
Renovation, Alteration - 15,400 SF
Results
$200,000 est. value
Salem, VA 24153

Last Updated 07/01/2022 02:55 AM
Project Title

York-Poquoson Sheriffs Office Phase 2 - Building Package

Physical Address View project details and contacts
City, State (County) Yorktown, VA 23692   (York County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The County of York, Virginia (Owner) is seeking the services of a professional contractor to perform the construction of a new Two-Story Sheriff's Office (approximately 51,550 sf), and a new One-Story Pre-Engineered Metal Building Structure (approximately 3,282 sf) that will serve as a vehicle support and storage warehouse facility, along with all other specified building and related site improvement work, as indicated in the Contract Documents. The Contractor shall furnish all materials, labor, tools, equipment, etc., to complete the project in accordance with the drawings and specifications.

Details

Prison/Jail, New Construction, 54,832 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents