Similar Projects
Elgin High School Expansion & Upgrades
Addition
Conception
Elgin, TX 78621

Elgin High School Fire Arts Addition
Addition
Conception
Elgin, TX 78621

Rosedale and New Northeast Middle School Design Build
New Construction
Design
Austin, TX

Construction Manager-at-Risk for Construction of School Campus
New Construction
Design
Austin, TX 78721

District Wide Fine Arts Renovations
Renovation
Post-Bid
$10,139,325 est. value
Pflugerville, TX 78660

CMAR Tuscany Center Building 1
Renovation
Post-Bid
Austin, TX 78710

Renovations at Bedichek Middle School
Renovation - 133,942 SF
Results
$2,004,419 est. value
Austin, TX 78745

CHS Culinary Arts Renovations
Renovation
Results
Less than $518,000 est. value
Pflugerville, TX 78660

AISD Eastside Memorial ECIHS High School
New Construction - 169,475 SF
Construction
Austin, TX 78721

Pflugerville ISD Accessibility Upgrades
Construction
$3,800,000 est. value
Pflugerville, TX 78660

Lake Travis High School Various Campus Improvements Package1
Post-Bid
Austin, TX 78738

New North East Middle School
New Construction - 130,000 SF
Results
Less than $43,736,000 est. value
Austin, TX 78723

LBJ Early College High School
Renovation - 56,258 SF
Construction
$14,500,000 est. value
Austin, TX 78724

Owner's Representation in Construction Projects Related to 2020 Bond
Post-Bid
$443,300 est. value
Lago Vista, TX

Bedichek Middle School Renovations
Renovation
Results
Less than $3,526,000 est. value
Austin, TX 78745

Last Updated 06/22/2022 08:34 AM
Project Title

Fine Arts Renovations at McCallum High School

Physical Address View project details and contacts
City, State (County) Austin, TX 78756   (Travis County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,841,800
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work: 1. Addition of a 2 story building that will house 2 dedicated dance studios, with wood sprung floors on the main level, and service and support spaces on the second floor. Building is an addition to the existing Performing Arts Center at McCallum High School. Scope includes partial and selective demolition of existing site features, as well as partial demolition of existing awning, where new building will tie in. 2. Architectural: Addition of a 2 story, 12,000 SF building. Light frame metal stud exterior framing with masonry veneer finish, 5/8” air and water resistive sheathing board, 1.5” continuous semi rigid mineral wool board insulation, fluid applied air barrier with stainless steel flashing. Anodized aluminum will be utilized for storefront and window systems. 3. Roofing: new roofing with Modified Bitumen and rooftop equipment. 4. Civil: Site Plan Revision through City of Austin to reconfigure parking lot and impervious coverage of new building footprint. 5. Plumbing: Addition of two full restrooms with showers and lockers for students, Dance teacher office with Restroom. 6. HVAC: Mechanical rooftop units and addition of chiller plant to service the Dance Studio Building. 7. Electrical: Light package designed for Dance studio as well as controls for supporting spaces, office, costume storage, showers/changing rooms. 8. Structural: The building foundation will consist of drilled piers, slab on select fill, perimeter grade beams and thickened slab between piers. Structural steel columns and steel beams, with metal deck comprise the structural frame system.

Details

Middle/Senior High School, 2 Stories Above Grade, 12,000 SF Renovation.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents