Similar Projects
Oakwood University Community Health Action Center
New Construction - 9,935 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Huntsville, AL 35816

USSRC Aviation Challenge Classrooms Addition
Addition - 2,512 SF
Results
Huntsville, AL 35805

Conference Training Center (CTC) Counseling Services Center Renovation
Renovation
Post-Bid
Huntsville, AL

Huntsville Spragins Hall Renovation
Renovation
Post-Bid
Huntsville, AL 35899

Carver Complex Hollis Wing RM 204 Interactive Learning Space Renovation
Renovation
Post-Bid
Huntsville, AL 35810

Elmore Health Science Restroom Renovation
Renovation
Post-Bid
Huntsville, AL 35811

Renovation of the Existing Animal Science Building
Renovation
Post-Bid
$200,000 est. value
Hazel Green, AL 35750

Olin B. King Technology Hall Materials Lab Renovation
Renovation
Post-Bid
$400,000 est. value
Huntsville, AL 35899

Outdoor Classroom
New Construction
Post-Bid
$300,000 est. value
Huntsville, AL

Alabama A&M University Agricultural Research Station Equipment Storage Facility
New Construction, Infrastructure
Post-Bid
$800,000 CJ est. value
Hazel Green, AL 35750

AAMU Terry Hall FCU & Piping Replacement
Renovation
Design
$200,000 CJ est. value
Huntsville, AL 35801

UAH VBH Research Special Project
Renovation
Post-Bid
$200,000 CJ est. value
Huntsville, AL 35805

J F Drake State Community and Technical College Temporary Modular Building
New Construction, Infrastructure
Post-Bid
$9,000,000 CJ est. value
Huntsville, AL 35811

Thomas Hall Renovations
Renovation
Bidding
$200,000 CJ est. value
Huntsville, AL 35810

Alabama A and M University Thomas Hall Renovations
Renovation
Bidding
$2,000,000 CJ est. value
Huntsville, AL 35811

Last Updated 01/13/2023 03:12 PM
Project Title

UAH Central Plant Building (CPB) Roof Replacement Project

Physical Address View project details and contacts
City, State (County) Huntsville, AL 35805   (Madison County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $70,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

A cashier's check or bid bond (DCM Form C-4) payable to The University of Alabama in Huntsville in an amount not less than five (5) percent of the amount of the bid, but in no event more than $10,000, must accompany the bidder's proposal. Performance and Payment Bonds and evidence of insurance required in the bid documents will be required at the signing of the Contract. Subcontractors and suppliers may obtain Bid Documents thru a bidding contractors or Datatek. Only general contractors who have been approved to bid pursuant to prequalification procedures and criteria established by the Owner will be eligible to bid for the Project. Written prequalification procedures and criteria are available for review at the office of Fuqua & Partners Architects, P.C., 100 Church Street, Suite 700, Huntsville, AL 35801. Bids must be submitted on proposal forms furnished by the Architect (Engineer) or copies thereof. All bidders bidding in amounts exceeding that established by the State Licensing Board for General Contractors must be licensed under the provisions of Title 34, Chapter 8, Code of Alabama, 1975, and must show evidence of license before bidding or bid will not be received or considered by the Architect (Engineer); the bidder shall show such evidence by clearly displaying his or her current license number on the outside of the sealed envelope in which the proposal is delivered. The Owner reserves the right to reject any or all proposals and to waive technical errors if, in the Owner's judgment, the best interests of the Owner will thereby be promoted. Notice of Sales & Use Tax Exemption: Materials incorporated into the Work are exempt from sales and use tax pursuant to Alabama Act No. 2013-205 (effective October 01, 2013). The contractor and their subcontractors shall be responsible for complying with rules and regulations of the Sales, Use, and Business Tax Division of the Alabama Department of Revenue regarding certificates and other qualifications to claim such exemption when making qualifying purchases from vendors. The Owner shall not consider claims for additional costs resultant of the contractor's, or their subcontractor's, failure to comply with such rules and regulations. Alabama Law (Section 41-4-116, Code of Alabama 1975) provides that every bid submitted and contract executed shall contain a certification that the vendor, contractor, and all of its affiliates that make sales for delivery into Alabama or leases for use in Alabama are registered, collecting, and remitting Alabama state and local sales, use, and/or lease tax on all taxable sales and leases into Alabama. Alabama Immigration Law (Act 2011-535 and codified in state law as Title 31, Chapter 13 of the Code of Alabama 1975, amended by Act No. 2012-491) requires the University to require all Contractors to enroll in the E-Verify program and to provide documentation of enrollment in the E-Verify program with their contracts or agreements. This is applicable to all General Contractors and Subcontractors performing work on a University project. Nonresident bidders must accompany any written bid documents with a written opinion of an attorney at law licensed to practice law in such nonresident bidder's state of domicile, as to the preferences, if any or none, granted by the law of that state to its own business entities whose principal places of business are in that state in the letting of any or all public contracts. Contractors may obtain PDF formatted Bid Documents from the Architect upon providing contact information. This contact information (email) is required and will be used for electronic distribution of any addenda or other information. Addenda and other information will be issued only to holders of drawings and specifications distributed by the Architect. he Work of Project is defined by the Contract Documents and consists of the following: 1. As described in the Bid Documents, project consists of the roof replacement of the Central Plant Building. The Central Plant Building is a single story building with approximately 7,000 square feet of roof, which includes one (1) roof area (drainage area) on one (1) level. Roof drainage is provided by four (4) internal roof drains with no emergency overflow drains and two (2) through-wall scuppers. Project will include a recover roofing with an adhered membrane roofing system and the removal and replacement of wet roofing with new roofing as indicated in the drawings.

Details

7,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Specialty Doors and Frames, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Insulation, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents