Similar Projects
The Firs At Talus
New Construction, Infrastructure
Conception
Issaquah, WA 98027

Brightwater Aeration Basin Optimization
Infrastructure
Design
$5,500,000 est. value
WA

Lake Hills and NW Lake Sammamish Interceptor Upgrade
Infrastructure
Design
$70,000,000 est. value
WA

South Renton Transit Center Remediation Project
Infrastructure
Bidding
$3,300,000 est. value
Renton, WA 98057

Sammamish River Cis
Alteration
Post-Bid
$1,200,000 est. value
WA

Environmental Remediation MAIDIQ (ERMA FY23)
Term Contract
Post-Bid

Herzman Levee Setback Construction
Infrastructure
Design
$4,200,000 est. value
WA

Quillayute River Restoration
Term Contract
Post-Bid

Mitigation Fairwood - 4 Phase - 2 Molasses Creek
Infrastructure
Design
WA

Lake Hills Interceptor Phase II
Alteration
Design
$13,330,000 est. value
WA

Fountain Ilse D91126
Infrastructure
Design
$300,000 est. value
WA

Madsen Dam DR0642
Infrastructure
Design
$300,000 est. value
WA

Brps Seismic Upgrades
Infrastructure
Design
$14,000,000 est. value
WA

Madsen Basin Retrofit
Infrastructure
Design
WA

Chinook Wind in Lieu Fee Mitigation Planting
Alteration
Design
$150,000 est. value
WA

Reported 04/22/2022 12:00 AM
Project Title

Fall City Floodplain Restoration Project

Physical Address View project details and contacts
City, State (County) Fall City, WA 98024   (King County)
Category(s) Environmental
Sub-Category(s) Wetlands/Remediation
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $9,715,074
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project includes removal of over 32,000 cubic yards of riprap armoring and levee material of the Snoqualmie River Bank (including the removal of approximately 1,100 feet of the Barfuse Levee and 1,290 feet of the right bank Haffner revetement), setting back over 1,000 feet of Neal Road SE away from the Snoqualmie River, constructing an 880 foot long buried Haffner Setback Rock Revetment adjacent Neal Road SE, excavating over 3,000 feet of new side channel on the right bank floodplain, restoring and enhancing 1,350 feet of the existing left bank side channel, floodplain grading, salvaging felled trees, and construction of engineered log structures to enhance fish habitat.

Details

Division 02 - Existing Conditions, Environmental Assessment, Natural Environment Assessment, Water Remediation.
Division 32 - Exterior Improvements, Wetlands.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents