Similar Projects
Reported | 04/22/2022 12:00 AM |
Project Title | Fall City Floodplain Restoration Project |
Physical Address | View project details and contacts |
City, State (County) | Fall City, WA 98024 (King County) |
Category(s) | Environmental |
Sub-Category(s) | Wetlands/Remediation |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | $9,715,074 |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project includes removal of over 32,000 cubic yards of riprap armoring and levee material of the Snoqualmie River Bank (including the removal of approximately 1,100 feet of the Barfuse Levee and 1,290 feet of the right bank Haffner revetement), setting back over 1,000 feet of Neal Road SE away from the Snoqualmie River, constructing an 880 foot long buried Haffner Setback Rock Revetment adjacent Neal Road SE, excavating over 3,000 feet of new side channel on the right bank floodplain, restoring and enhancing 1,350 feet of the existing left bank side channel, floodplain grading, salvaging felled trees, and construction of engineered log structures to enhance fish habitat. |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |