Similar Projects
Museum and Art Center
New Construction, Renovation - 59,000 SF
Design
$30,000,000 est. value
Brattleboro, VT 467274

Florence Bridge Installation
Bidding
Florence, VT 05744

North Street Bridge Replacement
Infrastructure
Bidding
Proctor, VT

STP CVRT(2) - Winooski River Bridge and Bike Path Construction
Post-Bid
Montpelier, VT

Clarendon VTRY (43) and Clarendon VTRY (44)
New Construction
Post-Bid
$500,000 to $1,000,000 est. value
Clarendon, VT

Berlin Im Deck (42) and Berlin Im Deck (43) and Berlin Im Deck (44) and Berlin Im Deck (45)
Term Contract
Results
$2,500,000 to $5,000,000 est. value
Berlin, VT 05602

Lovejoy Brook Bridge for Design/Build
Results
Ludlow, VT 05149

Fort Hill Bridge Removal, Stream Restoration and Route 15 Wildlife Passage Project
Construction
Less than $141,902 est. value
Williston, VT 05495

Arlington VTRY (23) and Arlington VTRY (24)
New Construction
Post-Bid
$250,000 to $500,000 est. value
Arlington, VT

Georgia BF 023-1(7)
Results
$1,000,000 to $2,500,000 est. value
Georgia, VT 05454

Hartland IM 091-1 (68)
Results
$1,000,000 to $2,500,000 est. value
Hartland, VT 05048

Eden BO 1448 (44)
Results
$500,000 to $1,000,000 est. value
Eden, VT 05652

Main Street Pedestrian Bridge Project, STP BP 14(3) and STP BP 17(7)
Results
$300,000 to $500,000 est. value
Plainfield, VT

Moxley Bridge
Results
Chelsea, VT 05038

Hardwick BF 037-3 (8)
Term Contract
Results
$500,000 to $1,000,000 est. value
Hardwick, VT 05836

Last Updated 05/05/2021 08:23 AM
Project Title

Kimball Avenue/Marshall Avenue Bridge over Muddy Brook TAP TA20(7)

Physical Address View project details and contacts
City, State (County) South Burlington, VT 05403   (Chittenden County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $2,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Beginning 1.0 miles easterly of Kennedy Drive and extending easterly along Kimball Avenue and Marshall Avenue 0.02 miles over Muddy Brook. Work to be performed under this project includes: The replacement of a 150’ span temporary bridge over Muddy Brook with a 36’ clear span buried precast concrete culvert structure. The Work will be Completed and ready for final payment on or before November 19, 2021. It is anticipated that Notice to Proceed will be issued on May 21, 2021 in order to complete shop drawing review prior to the Contractor taking the site. It is anticipated that the Contractor will be allowed to take the site on June 1, 2021. The roadway shall be closed to traffic for a maximum of 13 weeks, measured continuously from the date of closure.

Details

Bridge, Renovation.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents