Similar Projects
Design/Build Services for Route 146 Reconstruction
Bidding
Providence, RI 02912

2021 Paver Placed Elastomeric Surface Treatment C-1
Bidding

I-95 Resurfacing 2B - Charles Street to Lonsdale Avenue
Post-Bid
Pawtucket, RI

Seal Coating of Library Parking Lot
Post-Bid
Woonsocket, RI 02895

The Landing
Results
Central Falls, RI

Z--Project # 650-07-102: Pavement Repairs
Results
$2,000,000 to $5,000,000 est. value
Providence, RI 02908

Lowe's #2863 - Parking Lot Rehabilitation
Renovation
Post-Bid
North Providence, RI 02904

Slater Mill Phase II - Project
Results
Less than $1,017,357 est. value
Pawtucket, RI 02860

Paving Project 2020-2021
Term Contract
Post-Bid
Foster, RI 02825

State Traffic Commission Miscellaneous Improvements 2019
Results
Less than $1,678,500 est. value
Providence, RI 02903

Parcel 25 Temporary Parking Lot Restoration
Post-Bid
Providence, RI 02903

Pell Bridge Ramps - Phase I - Improvements to JT Connell and Coddington Highway
Results
Providence, RI 02903

Construction Services for City Wide 50/50 Sidewalk Program
Post-Bid
Pawtucket, RI

Green and Complete Streets
Results
Central Falls, RI

Blackstone River Bikeway
Post-Bid
Central Falls, RI 02863

Last Updated 03/09/2021 07:23 AM
Project Title

Infrastructure and Streetscape Improvements to Improve Residents’ Access to Commuter Rail Station and Bus Hub

Physical Address View project details and contacts
City, State (County) Central Falls, RI   (Providence County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Infrastructure and streetscape improvements on several neighborhood streets that will improve residents’ access to the new Commuter Rail Station and Bus Hub. Improvements will include repaving the roadways, replacing ADA curb ramps, replacing sidewalks and driveway ramps on both sides of the streets, planting trees and other vegetation, and installing green infrastructure and landscaping at the intersection of Watson, Rand, and Pine Streets. The following streets are to be improved: 1. Watson Street (Lonsdale Ave. to Pine St.) – approx. 1,000 ft. 2. Rand Street (Lonsdale Ave. to Pine St.) – approx. 1,100 ft. 3. Rand Street (Pine St. to Dexter St.) – approx. 470 ft. 4. Central Street (Pine St. to Dexter St.) – approx. 500 ft. 5. Knight Street (Pine St. to Dexter St.) – approx. 560 ft. 6. Cross Street (Pine St. to Dexter St.) – approx. 600 ft.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents