Similar Projects
Underground Storage Tank Removal - Town of Cheverly Public Works Yard
Demolition
Post-Bid
Cheverly, MD

Hydrogen Storage and Re-Fueling Project
Post-Bid
Baltimore, MD 21219

POL UST, AST, OWS Compliance Testing, Maintenance and Repair
Results
Aberdeen Proving Ground, MD 21005

Hamp Replace Convault Fueling Station
Results
$25,000 to $100,000 est. value
Towson, MD 21286

Fuel Line Repair
Post-Bid
Crisfield, MD 21817

Replacement of Central Yard Fuel Point
Results
Elkton, MD 21921

Tank Inspection - Martin State Airport
Post-Bid
Middle River, MD 21220

Anacostia Fuel Island Upgrade
Results
Hyattsville, MD 20781

Natural Gas Distribution System at University of Maryland Eastern Shore
Post-Bid
Princess Anne, MD 21853

Removal and Replacement of the Underground Fuel Tank and Dispenser
Results
Newark, MD 21841

Automatic Fuel Shut-Off System on MDOT MAA loading and Unloading Racks at MTN State Airport
Infrastructure
Post-Bid
Middle River, MD 21220

Tank Abandonment at Eastern Pre-Release Unit
Results
Less than $100,000 est. value
Church Hill, MD 21623

Service Two 1,000 Gallon Oil Tanks and Replace Hydraulic Oil
Term Contract
Post-Bid
Bethesda, MD 20817

Potomac WFP-UST #T-07, Replacement/Upgrade
Results
Potomac, MD 20854

Tank Inspection
Term Contract
Post-Bid
Middle River, MD 21220

Reported 02/02/2022 03:46 PM
Project Title

Replacement of Existing Underground Fuel Storage Tanks and Fuel Dispensing System at Tydings Marina

Physical Address View project details and contacts
City, State (County) Havre de Grace, MD 21078   (Harford County)
Category(s) Sewer and Water
Sub-Category(s) Fuel/Chemical Tanks and Lines
Contracting Method Competitive Bids.
Project Status All Bids Rejected, Project to Rebid
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of replacement of the existing 8,000 gallons gasoline and 4,000 gallons diesel underground storage tanks and dispensers with a new two compartment 12,000 gallons underground storge tank (8,000 gallons gasoline and 4,000 gallons diesel), and two new twin dispensers at the Tydings Marina. Related gasoline/diesel and vent piping, leak detection monitoring, electrical wiring/conduits, excavation and backfill, etc. shall be provided for the new 12,000 gallons underground storage tank and associated fuel dispensing system. Related existing gasoline/diesel fuel supply and vent piping shall be removed as indicated on the drawings. The existing paved areas affected by the demolition and new work shall be restored as stated on the construction documents and to the satisfaction of the Owner.

Details

Division 01 - General Requirements.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities, Fuel-Storage Tanks, Underground Fuel-Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents