Similar Projects
STH 87 - CTH Z Construction / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Luck, WI 54853

STH 87 - CTH Z Construction / Bridge Replacement
Demolition, New Construction, Infrastructure
Conception
$500,000 CJ est. value
Luck, WI 54853

Baldwin - Cumberland, St. Croix / Polk Co
Infrastructure
Bidding
$5,000,000 CJ est. value
Clayton, WI 54004

Baldwin - Cumberland, St. Croix / Polk Co
Infrastructure
Bidding
$5,000,000 CJ est. value
Clayton, WI 54004

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

Blacktop
Infrastructure
Post-Bid
Clear Lake, WI 54005

Star Prairie - Osceola, Scl to Cth Y
Results
Osceola, Star Prairie, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Municipal Parking Lot
Infrastructure
Bidding
$400,000 CJ est. value
Balsam Lake, WI 54810

Paving of 75th Street
Infrastructure
Post-Bid
$700,000 est. value
Amery, WI 54001

Kentucky and River Street Improvements
Results
Saint Croix Falls, WI 54024

2022 Luck Street Construction - Pulverizing and Paving
Infrastructure
Post-Bid
$200,000 est. value
Luck, WI 54853

Statewide Pavement Maintenance 2021-2022
Term Contract
Results
Less than $5,000 est. value

Road Work
Infrastructure
Post-Bid
$180,000 est. value
Balsam Lake, WI

Milltown Avenue Reconstruction
Results
Milltown, WI

Last Updated 08/18/2022 12:08 PM
Project Title

2022 Street Resurfacing Village View Street and Bean Street

Physical Address View project details and contacts
City, State (County) Clear Lake, WI 54005   (Polk County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $113,498 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The work, in general, will include the approximate quantities and items listed below: Storm Sewer, RCP, 15 and Appurtenances 47 lf Asphaltic Pavement Pulverize and Relay 2,900 sy Crushed Aggregate Base 193 cy Hot Mix Asphalt, 3 2,770 sy Concrete Curb and Gutter, 24" Mountable 220 lf Concrete Driveways, 6 .80 sf Traffi c Control 1 ls Topsoil, Turf, and Grasses 1,800 sy The proposals shall be submitted on the forms furnished with the specifi cations. Each proposal shall be accompanied by a certifi ed check payable to the owner equal to fi ve percent (5%) of the proposal or a bid bond of a bonding company duly authorized to do business in the State of Wisconsin in an amount equal to fi ve percent (5%) of the proposal. This proposal guarantee shall be subject to forfeiture as provided by law. When submitting an electronic bid, Bidder is required to deliver the original certifi ed check or bid bond within 72 hours of bid opening to Cedar Corporation. The website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All offi cial notifi cations, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. This project is part of a WisDOT Local Road Improvement Program (LRIP), which consists of street resurfacing on Village View Street from 5th Street/CTH JJ to end terminus and Bean Street from Grimmes Street to end terminus. Proposals shall not be withdrawn for a period of 45 days after the date of opening. The Village of Clear Lake reserves the right to reject any or all of the proposals and to waive any informalities therein.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents