Similar Projects
Last Updated | 08/18/2022 12:08 PM |
Project Title | 2022 Street Resurfacing Village View Street and Bean Street |
Physical Address | View project details and contacts |
City, State (County) | Clear Lake, WI 54005 (Polk County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Construction start expected July 2022 |
Bids Due | View project details and contacts |
Estimated Value | $113,498 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The work, in general, will include the approximate quantities and items listed below: Storm Sewer, RCP, 15 and Appurtenances 47 lf Asphaltic Pavement Pulverize and Relay 2,900 sy Crushed Aggregate Base 193 cy Hot Mix Asphalt, 3 2,770 sy Concrete Curb and Gutter, 24" Mountable 220 lf Concrete Driveways, 6 .80 sf Traffi c Control 1 ls Topsoil, Turf, and Grasses 1,800 sy The proposals shall be submitted on the forms furnished with the specifi cations. Each proposal shall be accompanied by a certifi ed check payable to the owner equal to fi ve percent (5%) of the proposal or a bid bond of a bonding company duly authorized to do business in the State of Wisconsin in an amount equal to fi ve percent (5%) of the proposal. This proposal guarantee shall be subject to forfeiture as provided by law. When submitting an electronic bid, Bidder is required to deliver the original certifi ed check or bid bond within 72 hours of bid opening to Cedar Corporation. The website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All offi cial notifi cations, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. This project is part of a WisDOT Local Road Improvement Program (LRIP), which consists of street resurfacing on Village View Street from 5th Street/CTH JJ to end terminus and Bean Street from Grimmes Street to end terminus. Proposals shall not be withdrawn for a period of 45 days after the date of opening. The Village of Clear Lake reserves the right to reject any or all of the proposals and to waive any informalities therein. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |