Similar Projects
Weigh Station Improvement - TH 94
Infrastructure
Conception
$280,000 CJ est. value
Moorhead, MN 56560

O'Reilly Auto Parts (MH3) / Moorhead
New Construction, Infrastructure
Conception
$400,000 CJ est. value
Moorhead, MN 56560

Community Center and Public Library - Moorehead, MN
New Construction, Infrastructure
Design
$800,000 CJ est. value
Moorhead, MN 56560

PRESS - 30th Ave Fitness Center Alternation - Enclave Construction
Addition, Demolition, Renovation, Infrastructure
Design
$150,000 CJ est. value
Moorhead, MN 56560

RFQ Construction Manager - Construction Management Services for the Clay County Substance Abuse Crisis Facility
New Construction, Infrastructure - 21,771 SF
Post-Bid
$13,900,000 CJ est. value
Moorhead, MN 56560

2023 Local Street and Utility Improvement Project
Infrastructure
Post-Bid
$700,000 CJ est. value
Moorhead, MN 56560

CSAH 52 (Mill and Overlay)
Infrastructure
Results
$3,497,284 CJ est. value
Moorhead, MN 56560

MSUM Alumni Center
Demolition, New Construction, Infrastructure
Results
$8,085,000 CJ est. value
Moorhead, MN 56560

Moorhead Area Public Schools High School Bid Group IV
New Construction, Infrastructure
Pending Verification
$3,200,000 CJ est. value
Moorhead, MN 56560

7th Street South Office Renovation and Addition
Addition, Demolition, Renovation, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Moorhead, MN 56560

42nd Street Warehouse / distribution Facility / Moorhead
Addition, Demolition, Renovation, Infrastructure
Design
$500,000 CJ est. value
Moorhead, MN 56560

Chipotle Mexican Grill - Site and Shell / Moorhead
New Construction, Infrastructure - 2,328 SF
Post-Bid
$700,000 CJ est. value
Moorhead, MN 56560

Glyndon East Tributary Restoration Project
Infrastructure
Results
$1,105,498 CJ est. value
Glyndon, MN 56547

34th Street South Financial/Office Development / Moorhead
New Construction, Infrastructure
Design
$3,068,086 CJ est. value
Moorhead, MN 56560

Hawley Elementary & High School Renovation and Addition
Addition, Demolition, Infrastructure, Build-out - 181,871 SF
Post-Bid
$9,500,000 CJ est. value
Hawley, MN 56549

Last Updated 06/30/2023 01:04 PM
Project Title

2023 Access Improvements for the Lime Sludge Dewatering Facility

Physical Address View project details and contacts
City, State (County) Moorhead, MN 56560   (Clay County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $394,026 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this project is to improve access to the newly-constructed Lime Sludge Dewatering Facility by constructing a concrete driveway better suited to handle heavy equipment use. This project will also include constructing proper drainage for the surrounding area adjacent to the Lime Sludge Dewatering Facility. The current roadway material is a combination of aggregate and recycled pavement. These materials are subject to shifting and settling throughout the annual weather seasons resulting in ponding water and frost heaves. The concrete driveway will also reduce tracking material onto Highway 75 North, and eliminate rutting near the newly-installed security gate. On a weekly basis, the current access driveway is heavily trafficked with over a dozen semi-trucks entering and exiting to haul the newly-produced lime sludge material. The General Manager respectfully requests the Commission approve the specifications and authorize advertisement for bids for 2023 Access Improvements for the Lime Sludge Dewatering Facility, contingent upon final legal approval. Bids shall be upon basis of each payment for the following major estimated quantities: Item Unit Quantity 8" Concrete Pavement SY 2,344 12" Reinforced Concrete Pipe LF 193 Drainage Structure Design G EA 2 Turf Establishment LS 1 ALL QUESTIONS SHOULD BE DIRECTED TO: Jade Berube, Project Engineer, Apex Engineering Group, at 701-373-7980 or jade.berube@apexenggroup.com. All questions must be received in writing or by e-mail on or before seven (7) days prior to the bid opening. Responses to technical questions will be issued via addendum through QuestCDN prior to the bid opening. Direct questions about this Project, including pre-bid questions, to Jade Berube at 218-844-2584 and Jade.Berube@ApexEngGroup.com.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents