Similar Projects
Douglass Cafeteria Flooring Improvements
Post-Bid
El Paso, TX 79925

Gymnasium and Entry Floor Covering Replacement for Tally Elementary School
Post-Bid
Kerrville, TX 78028

Epoxy Flooring
Results
Laredo, TX 78040

Z2jz--New - CTX Floor Refinishing Services
Results
Temple, TX 76504

Villa Sandoval-Longoria Flood Repairs
Post-Bid
Weslaco, TX 78596

Floor Finish Seal
Post-Bid
Houston, TX

Reported 05/06/2021 12:00 AM
Project Title

Searcy Center Gym Floor Replacement

Physical Address View project details and contacts
City, State (County) Pearland, TX 77581   (Brazoria County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $230,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

At Searcy Gym at Pearland High School remove the existing wood floor including entire support of wood floor and wall base. Move existing bleachers as required to remove and install new wood gym floor per specification section 09 64 66. All painted court stripping as shown on drawing A1.00 to be included in base bid. All Graphics to be included in continency. Reinstall existing bleachers where originally located.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents