Similar Projects
Reported | 05/06/2021 12:00 AM |
Project Title | Searcy Center Gym Floor Replacement |
Physical Address | View project details and contacts |
City, State (County) | Pearland, TX 77581 (Brazoria County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | $230,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | At Searcy Gym at Pearland High School remove the existing wood floor including entire support of wood floor and wall base. Move existing bleachers as required to remove and install new wood gym floor per specification section 09 64 66. All painted court stripping as shown on drawing A1.00 to be included in base bid. All Graphics to be included in continency. Reinstall existing bleachers where originally located. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |