Similar Projects
CHRL Pump Station 1A, 2 and 3
Infrastructure
Design
$630,000 est. value
WA

Buttes Well 2 Emergency Improvements
Infrastructure
Bidding
Orting, WA 98360

Rebid - Chrl Leachate Pump Stations 1A Electrical, 2 And 3 Upgrade
Term Contract
Bidding
$1,945,000 to $2,145,000 est. value
WA

Tapteal 1 Pump Station Upgrade
Infrastructure
Post-Bid
Richland, WA 99352

Condensate Pump 1 Alpha Refurbishment
Alteration
Post-Bid
Richland, WA

Water Station 5 Reservoirs and Pump Station
Infrastructure
Results
$28,250,000 est. value
Vancouver, WA 98687

Gooseberry Point Wastewater Treatment Plant Improvements
New Construction, Renovation, Infrastructure
Results
$13,000,000 to $14,500,000 est. value
Bellingham, WA 98226

Ginkgo Petrified Forest State Park - Well Replacement
Infrastructure
Bidding
$143,500 to $166,700 est. value
Vantage, WA 98950

Kayak Well Rehabilitation
Infrastructure
Post-Bid
$90,000 est. value
Stanwood, WA 98292

Well No. 6
Alteration
Results
$2,189,000 est. value
College Place, WA 99324

Kennedy Test Well
Infrastructure
Bidding
$700,000 est. value
Ridgefield, WA

Hanford Integrated Tank Disposition Contract
Alteration
Post-Bid
WA

Aurora 1160 Series Pump Refurbishment
Alteration
Results
Keyport, WA 98345

Havana Well Station - Phase One
New Construction, Infrastructure
Post-Bid
Spokane Valley, WA

Furnish and Install 60HP Input Pump Motor
Infrastructure
Results
Ridgefield, WA 98642

Reported 04/13/2022 12:00 AM
Project Title

Booster Station Replacement - Phase II

Physical Address View project details and contacts
City, State (County) Latah, WA   (Spokane County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $2,800,000 to $3,100,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Booster Station Replacement – Phase II generally consists construction of two (2) new booster pump stations - Indian Hills and Ponderosa - including site work - piping - pumps and all appurtenances - electrical and controls. It is the intent of these documents to describe the work required to complete this project in sufficient detail to secure comparable bids. All parts or work not specifically mentioned that are necessary in order to provide a complete installation shall be included in the bid and shall conform to all local - State - and Federal requirements.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents