Similar Projects
New Antennas
Alteration
Design
Ashland, OR

Portland Proper Hotel
Renovation - 170,000 SF
Design
Portland, OR 97209

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Residential HVAC Contractors
Term Contract
Post-Bid
OR

Ecola Ridge Young Stand Thinning Restoration Project
Alteration
Post-Bid
Cannon Beach, OR 97110

OR6: Mills (Wilson River) Bridge Project on the Wilson River Highway
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

OR47: Nehalem River Bridge Project on the Nehalem Highway
New Construction, Infrastructure
Results
$1,000,000 to $2,000,000 est. value
OR

GAOA Burnt Cabin Trail Bridge Replacement
New Construction
Design
$250,000 to $500,000 est. value
Milton Freewater, OR

Walla Walla River Road Bridge
New Construction, Infrastructure
Bidding
$500,000 to $600,000 est. value
Milton Freewater, OR

Dpt Drilling Services In Portland
Infrastructure
Post-Bid
Portland, OR

Southern Oregon Seismic Bridge Retrofit (Phase 2)
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
OR

OR153 Salt Creek Bridge Project on the Bellevue Hopewell Highway
New Construction, Infrastructure
Bidding
$5,000,000 to $10,000,000 est. value
OR

Excavation Service
Infrastructure
Post-Bid
Astoria, OR

Coleman Ck. (Phoenix) Project on the Rogue Valley Highway (Rt. No. OR99)
New Construction, Infrastructure
Results
$2,000,000 to $5,000,000 est. value
Phoenix, OR

Last Updated 12/28/2021 04:34 PM
Project Title

Latourell Creek Bridge

Physical Address View project details and contacts
City, State (County) Corbett, OR 97019   (Multnomah County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,000 to $1,050,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of furnishing, installing, operating, maintaining, and removing temporary water management facilities in regulated Work areas.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Grading, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 33 - Utilities.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents