Last Updated | 10/03/2022 06:05 AM |
Project Title | Repair HVAC Systems, B3331 |
Physical Address | View project details and contacts |
City, State (County) | Joint Base Mdl, NJ 08641 (Burlington County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected September 2022 |
Bids Due | View project details and contacts |
Estimated Value | $292,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Award Details Contract Award Date: Sep 26, 2022 Contract Award Number: W50S8B22C0003 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: D4HWKEWM8TT3 Contractor Awarded Name: GAUDELLI BROS (INC) Contractor Awarded Address: Millville, NJ 08332-3542 USA Base and All Options Value (Total Contract Value): $292000.00 Repair HVAC Systems B3331 1. This is a Sealed Bid construction solicitation offered in accordance w ith (IAW) Far part 13, 14, 36 & 42 for a 100% Small Business set aside project to repair the HVAC in building 3331. 2. The construction magnitude is betw een $250,000 and $500,000. The scope of w ork for this project requires the contractor to provide all material, equipment, supplies, labor & supervision required to complete project in accordance w ith the SOW. 3. The applicable NAICS 236220 ($39,500,000). 4. This project is on a secure military facility. All personnel accessing the base w ill be required to submit personal information for a background investiation w ith the National Crime Information Center Interstate Identification Index (NCIC-III) and Terrorist Screening Database (TSDB) in accordance w ith AFI 10-245. 5. A Pre-Bid Conference & Site Visit w ill be conducted by the Government. Please review w w w .SAM.GOV for detials Project Overview: This project encompasses HVAC sustainment work to be performed in B3331; specifically on the western half of the building. The facility was constructed in 1980 and its HVAC systems to include the exterior pad mounted condensing unit, Air Handler Unit (AHU) located inside B3331's mechanical room, and Variable Air Volume (VAV) boxes have reached the end of their life cycle and are in need of replacement to a more energy efficient system. Also, the majority of the controls are still analog and are required to be converted over our digital control network located in B3301. Contractor shall adhere to standards and requirements in all attachments(sequence of operation,Attachment 3 HVAC Spec, etc). *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |