Similar Projects
JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Noble Hall AHU Replacement
Results
Less than $365,000 est. value
Greensboro, NC

Smith Technology Building Cooling Tower Replacement
Results
Less than $500,000 est. value
Greensboro, NC

Carver and Webb Halls Fume Hoods Replacement
Post-Bid
Greensboro, NC

McIver HVAC Addition for McIver School
Results
Greensboro, NC 27405

Construction of Ductwork Modifications
Post-Bid
Greensboro, NC 27411

IRC Building Chiller Replacement
Results
Less than $500,000 est. value
Greensboro, NC

HVAC Repair and Maintenance Services
Term Contract
Post-Bid
NC

Chiller Maintenance for the Engineering and Inspections Department
Term Contract
Results
Greensboro, NC 27401

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

High Point Mental Health HVAC Renovations
Results
High Point, NC 27260

Cone ES RTU Replacement
Post-Bid
Greensboro, NC 27405

Northwest High Gym AC
Results
Greensboro, NC 27409

Chiller Plant Replacement for Southern Elementary School
Post-Bid
Greensboro, NC 27406

Last Updated 07/09/2020 03:37 PM
Project Title

Cooling Tower Replacement Smith High School Project

Physical Address View project details and contacts
City, State (County) Greensboro, NC 27406   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The existing twin cooling tower system will be removed and replaced. A new twin cell cooling tower with VSD fans will be installed at the same location The existing condenser pump will be replaced with a new condenser pump with VSD A three -way mixing valve will be installed in the mechanical room to allow condenser water reset. Existing DDC controls will be reused with modifications to accomplish a temperature reset. Electrical will reuse existing power with some modifications, a new circuit will be run for basin heaters.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents