Similar Projects
2022 CIPP Rehabilitation Project Prequalification
Infrastructure
Bidding

Ingersoll Rand Compressed Air System Purchase and Install
Post-Bid

Sunbrook Golf Course Drainage
Post-Bid
Saint George, UT 84770

New Bingham Highway Detention Park
Results

Hvac Install For New Metal Building Construction
Term Contract
Results
Less than $80,000 est. value
Saint George, UT 84770

Kolob Terrace Road Retaining Walls
Infrastructure
Post-Bid
Saint George, UT

Bookcliffs Pond Maintenance and Excavating
Infrastructure
Results

HVAC and Plumbing
Term Contract
Post-Bid

1250 North Drainage
Infrastructure
Results
Saint George, UT 84770

UDOT Pavement and Approach Slab Stabilization and Lifting AVL
Term Contract, Infrastructure
Post-Bid

Rooftop HVAC Unit Replacement
Alteration
Results
Saint George, UT

Pine View Estates Erosion Protection
Infrastructure
Post-Bid
Washington, UT

DSU - 100 South Flood Wall Project
Infrastructure
Results
Saint George, UT 84770

Uintah Indian Irrigation Project
Term Contract
Post-Bid
$471,000 est. value

DSU - Taylor Dental Chiller Project
Alteration
Results
Saint George, UT

Last Updated 02/11/2022 03:29 AM
Project Title

DFCM Construction-Pre Qualified General-DWS Saint George Office Drainage and HVAC

Physical Address View project details and contacts
City, State (County) Saint George, UT 84770   (Washington County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) HVAC, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $148,251
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Repair walls due to water damage in 3 rooms 2. Replace some condensing units and furnaces 3. Provide a drainage path swale in North side of building 4. Change landscaping to zero scape.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents