Similar Projects
Watershed Pointe / Divide Highway
New Construction, Infrastructure
Conception
$11,700,000 CJ est. value
Little Rock, AR 72212

New District Courts Facility - 2022 Bond - City of Little Rock
New Construction
Conception
$8,500,000 CJ est. value
Little Rock, AR 72201

Fox Meadow Subdivision
New Construction, Infrastructure - 35,000 SF
Design
$3,900,000 CJ est. value
Siloam Springs, AR 72761

Sultana Museum and Interpretive Exhibits
Renovation, Infrastructure - 23,000 SF
Design
$400,000 CJ est. value
Marion, AR 72364

Thibault Road Relocation
Infrastructure
Bidding
$300,000 CJ est. value
Little Rock, AR 72206

Thibault Road Relocation
Infrastructure
Bidding
$300,000 CJ est. value
Little Rock, AR 72206

Ellis Estates
New Construction, Infrastructure
Conception
$15,750,000 CJ est. value
Fayetteville, AR 72703

Metro Business and Space Center
New Construction, Infrastructure - 112,258 SF
Design
$12,100,000 CJ est. value
Rogers, AR 72758

Detrola Motel
New Construction, Infrastructure
Bidding
$32,000,000 CJ est. value
Bentonville, AR 72712

The Lofts at Kanis Creek
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Little Rock, AR 72223

JA Riggs Facility Expansion
New Construction, Infrastructure - 10,112 SF
Design
$2,700,000 CJ est. value
Springdale, AR 72762

Western Corridor Pump Station
New Construction, Infrastructure
Bidding
$170,000 CJ est. value
Lowell, AR 72745

Baptist Health Emergency Room Expansion - Van Buren
Addition, Infrastructure
Conception
$10,000,000 CJ est. value
Van Buren, AR 72956

K-Life Of Hot Springs
New Construction, Infrastructure - 3,000 SF
Design
$981,000 CJ est. value
Hot Springs, AR 71913

Basins 2-13-14 Wastewater Improvements
Infrastructure
Bidding
$300,000 CJ est. value
Paragould, AR 72450

Last Updated 03/07/2023 03:34 PM
Project Title

Construction of the Adem - Drainage Improvements

Physical Address View project details and contacts
City, State (County) Glenwood, AR 71943   (Pike County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $390,807 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Furnishing all labor, equipment, materials, supplies, and supervision necessary for the construction of culvert replacement and bank stabilization and all associated appurtenances as described in the plans and specifications. A CERTIFIED OR CASHIER'S CHECK, or an acceptable bid bond in an amount not less than five percent (5%) of the total bid shall accompany each bid as a guaranty that, if awarded the contract, the bidder will promptly enter into contract with the City of Glenwood, Arkansas and furnish bonds on the forms provided. THE SUCCESSFUL BIDDER OR BIDDERS will be required to furnish a Performance and Payment Bond, each in the amount of the contract, written by a responsible surety company authorized to do business in the State of Arkansas that is satisfactory to the Owner. BIDDERS ARE expected to inspect the site of the work and to inform themselves of all local conditions. The time of completion shall be 45 calendar days including Saturdays, Sundays and legal holidays. An Arkansas Contractor's License is not required to bid the job, however at the time the contract is signed, the Contractor must be licensed. THE SUCCESSFUL BIDDER will be required to furnish evidence of registration with the State Department of Finance and Administration in compliance with Act 125 of 1965 prior to engaging in the performance of this Contract. NO BID may be withdrawn after the scheduled closing time for receipt of bids for at least 60 calendar days. IN CASE of ambiguity or lack of clearness stating the price in the bids, the City of Glenwood, Arkansas reserves the right to consider the most advantageous construction thereof, or to reject the bid. THE CITY OF GLENWOOD, ARKANSAS reserves the right to reject any or all bids, waive any or all informalities, and to award the contract to the bidder or bidders who, in the opinion of the Owner, offers the proposal to the best interest of same. Award of the contract may be denied if the Statement of Qualifications is not appropriately completed. CONTRACTORS are cautioned that qualified bids will be subject to rejection. CONTRACTORS are specifically advised that any person, firm, or other party to whom it is proposed to award a subcontract under this contract must be acceptable to the Owner. Buy America provisions apply to this project. Registration and good standing in the System for Award Management (SAM) will be required prior to contract execution. The City of Glenwood, Arkansas hereby notifies all bidders that this contract is subject to applicable labor laws, non-discrimination provisions, wage rate laws and other federal laws including the Fair Labor Standards Acts of 1938. The Work Hours Act of 1962 and Title VI of the Civil Rights Act of 1964 also apply.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents